Laserfiche WebLink
m {: <br />STATISTICS. <br />Grosz tonnaE;e, 3,000. iJ0 tonnage at present. <br />Total feet in dl>FeftsD.r-.A6@.~ Oost per ~1oot~Py20'.00. <br />Total i'sst in dr:i;ta or lovele, 3,000 Gost per foot ~$10.Q0, <br />it The al,ovo includes cross cuts. , <br />Tctal fast in wxnzes and raises, 200. Coat per foot X15.00, <br />~~ 'i'.otal feat in development, 3,960. - ~ . <br />?rten employed. <br />2 macl?ins drillmen, ~~.00 for 8 hour shift. <br />1 trimmer, 3.00 for 8 hour shift.. <br />1 engineer, <br />~ Averar,;e number of men employed ~:psd, 4. 3 underF;round a~ <br />1 on surfaea. <br />Cost. <br />Coat of fuel ;5.75 per ton. AveraP;e cost per month `180.00, <br />Cost of timber ~y20.00 per;Pd. AveraS~;e cost' per~rnonth,40.00. <br />Cost oi' steel 9P! par lb. AveraP~;e cost per mouth, `10.00. <br />Cost of oil 65, per gal. Average cost per month; hpT000. <br />~,~ Cost of powder ,x"13.95 per curt. /!verat*a cost per month, j219.25, <br />Average ar,say value of ore ~er ton, X30.00. <br />Coat per ton c,iniry; of ore ,y7.00. <br />Coat per ton transporting ore, 75f! on wagon and X1.50 on R.R, <br />Cost per ton treatment of oro x¢7.00. <br />