Laserfiche WebLink
<br />STATISTICS. <br />rros:; ton±:age, 3,000. lJo tonnage at present. <br />Total feet in srafts,-.9fl0. Cost per root :y20.00. <br />Total i'eet in drifts or lovels, 3,000. Cost per root x$10.00, <br />ri'he above includes cross cuts. <br />Tctal feet in erirues a*:d raises, 200. Cost per foot X15.00. <br />Yotal-feet in development, 3;9G0. <br />?en employed. <br />2 machine drillmen, ,x`4,00 for 8 hour shift. <br />1 tra:mner, 3.00 for 8 hour shi't.• <br />1 engineer, <br />Avernp;e number of men employed t4~:ps:dv+~.•, 4. 3 underp;round e <br />1 on surface, <br />Coat. <br />Cost of i'uel ;5.75 per ton, Average cost per month 180.00. <br />Cost of timber x"20.00 per.Plf. Averah;e cost' per"month, 40.00, <br />Cost oP steel 91! per lb, p,verage cast per month, 10.00, <br />Cost of, oil 65, per gal, Average cost per month, 'S 10:00. <br />Cost of rovrder y~,lu.95 per curt, Averar';e coat per moat:^ j210.25, <br />Ave rape assay value of ore ~er ton, X30.00, <br />Cost per ton miniru; oi' ore ,87.00. <br />Cost per ton transl~~orting ore, 75~ on wagon and ~j1.50 on R.R. <br />Cost per tor. treatment of ore X7.00. <br />