My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK01099
DRMS
>
Day Forward
>
Mine Books
>
MINEBK01099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2009 9:56:48 AM
Creation date
11/18/2007 12:27:12 PM
Metadata
Fields
Template:
Mine Books
County
Gunnison
Volume
16
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Pandora -4 <br />MINING A N D M I N E M E T H O D S <br />The main opening is a orosacut tunnel 700 Yeet in <br />length. It tape the Sangamon rein about 400 feet from entranoe <br />of tnnnel~ and the Pandora vein .700.feet from entrance of <br />tunnel. Drifting is being carried on on both of these veins <br />'at present in both directions. There is no atoping being <br />done. Leyner drills are being used for drifting. Tho method <br />of timbering in tunnel is square seta where necessary and covered <br />with lagging. ~Yte timbers are pine and spruce prepared by hand <br />and are sufficient to secure safety. underground training is <br />done by hand. Traux steel cars are used for tramming. The <br />syabem oP ventilation is a fan and air compressor run all the <br />time. There is an upraise started for air. Candles are used <br />for lighting underground. Drainage vrater rune on aide of track <br />to a point ono hundred feet from portal of tunnel and thott it <br />goes under track to keep portal dry. <br />S T A T I S T I C S <br />Total number of feet in crosscut or tunnel 700. Per ft. $7.00 <br />Total number of feet in drifts and other tunnels 800. Q7.00 per ft. <br />Total number of feet in development 1500 <br />Coat of Powder per lb. 15~. <br />Cost of fuel--plenty of wood. <br />Coat of transporting supplies to mind, X5.00 per ton. <br />Men employed: <br />2 Machine Drillmen y4.00 for 8 hours. <br />2 Maohine Drill helpers 3.50 for 8 hours. <br />2 trammera <br />3.00 for 8 hours. <br />1 Laborer 3.00 for 8 hours. <br />2 compressor engineers 4.00 for 8 hours. <br />1 Blaokamlth <br />1 Superintendent <br />4.00 for 8 hours. <br />6.00 Yor 8 hours. <br />
The URL can be used to link to this page
Your browser does not support the video tag.