Laserfiche WebLink
. (2? <br />Mining. <br />The main opening to this property is a tunnel 500 Peet in the <br />mountain,150 Peet Prom the portal an interior shaft has been <br />sunk to the depth oP 200 Peet Prom which two levels have been <br />driven on the course of the veln,oonneetions have been made on <br />these levels by upraise etopes with the tunnel above. <br />Hoisting. <br />;Method employed machinery driven by electricity,by which men <br />;are raised and lowered-Distance hoisted 200 Peet-Cab to 3~~ inch <br />!steel(good Material hoisted Prom two levels-Aell rope oP I~2 <br />'~inoh manilla-Mining Bureau code oP signals used,whioh are pos- <br />let engine and at collar oP zihaft. <br />Mine methods. <br />Stoping and drifting-NO machine drills employed-Single hand <br />':drilling used-Timbering,stulls and laggin~Underground tram- <br />'ming by men with bucket and truck on I2 lb.to the yard rail- <br />No water handled-Ventilation,natural draft. <br />Exits. <br />,Shaft is divided into tyro eompartments,with ladder way in good <br />'condition-Exit. also by way of upraises to tunnel above. <br />Lighting underground,electrioity and candles. <br />Statistics. <br />No productlon at prersent time. <br />Development. <br />same ao report of 1913. <br />Men employed. <br />5 uinere. X3.50. per day. q hour shift. <br />', I Foreman. #S.oU. " " S " " <br />i ,.. <br />Average No. of men employed for the year:-6. <br />Cost. <br />Oost of fuel:-Fieetricity. <br />" "timber ~25.Dcr Io00.Average cost per month:-~200fJ00. <br />" " powdex 15 cts.per lb. " " " " :-#50.00. <br />Average assay value of ore per ton:-No production at pxaAent. <br />aesiexai remarks. <br />same ae report of 1913. <br /> <br />