My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK01095
DRMS
>
Day Forward
>
Mine Books
>
MINEBK01095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 11:28:23 AM
Creation date
11/18/2007 12:27:09 PM
Metadata
Fields
Template:
Mine Books
County
Summit
Volume
16
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S~X'T.vF`~enp' "~l~ I - 7'~ <br />A w y n t. <br />.. <br />'.~ ' <br />i <br />j ~'.` ~ ~' <br />f . <br />',L~ - Title. <br />-::. <br />Owner or Company:-The Boiivar Mining Company. <br />Incorporated under the laws of the State of Arizona. <br />Capital Stook:-#2.000.000.-Shares,par value:-#L o0.eaoh. <br />Principal offioe looated at St.Joaeph,>siaaouri. <br />Branoh offioe located at Hontezuma,Summit Co.Colo. <br />President:-F.E.Werth-St.Joseph,3[o. <br />Secretary:-T.G.Sorter- " " <br />tanager:-Chaa.De111ker-Montazuma,Summit Oo.Colo. <br />Date oP original location:-Ig90. <br />n n " oPeninge:-IS91. <br />Altitude:-II.000.-Character of aurfaoe,mountainous-Streams, <br />water aupply,Snake river-Timber yea-Ronda,wagon road to Sey- <br />etone to C.&.S.Ry' <br />There is a geological survey of the diatriot:-Emmons. <br />Struoture and oharacter of oountry rook:-Granite and Gneiaa. <br />Ore bodies. <br />Charaoter oP same-gulphidea.StriKe H.E.de.&.g.W.Dip 'vertioal. <br />Vein width 30 inohea-Length opened 145 foet.ltine hen mill. <br />Ores. <br />AlI ores mined are ooncentrated,and sent to ameltex. <br />3(etale and minerals:-GO1d;Silver,lead,and Zino. <br />Assays and analysis after oonoentration:-Gold #4.00.911ver 15 <br />Oz.Lead I2 per oent,Zino 48 per oast. <br />Power plant. <br />There in no machinery on the m1ue.50 H.P.boiler ix mill. <br />Explosives. <br />No work being dons in mine mill running on dump ore that was <br />mined some Ye~'a ago. <br />1[ining. <br />The main opening to the mine is a tunnel 1000 feet in length, <br />e Dross out drift has Leon drove I00 Peat whloh ntnxta about <br />G00 toot Prom portal oi' tunnol.iJo worK being dono underground <br />at greaent time. <br />' 9tatintios. <br />Average tonnage por month about b0 tons of oouoontrates from <br />309 toua of orude ore-Gross tonnage per year:-720 tons., <br />I . <br />~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.