Laserfiche WebLink
<br />as on trucks ~ . <br />, ' STATISTICS. <br />Ira, madec <br /> Productiort:- <br /> ,~AvoraOe tonrtap;e por mo:tth> 100. <br />s, crops- Povelopment:- <br />tn, Total PIo. of feet in ~shafts, 135. Cost per foot, x20.00 <br />ound rrork_ Total TJo. of feet in tunnels or adits, 2,000. <br /> Cost par foot, 578.00 <br /> Total PIo. of feet in vri.xizes and raises, 315.- <br />Provided Total number of feet in dovelcpmertt <br />16 00 <br /> , . <br />cafe, sec~.~re habor, men employed. <br /> <br />ch do not G machine dri~llmen <br />~ rs <br />~{d•00 for <br />D hour shift <br /> 2 machine hel ers <br />P ~ <br />3.fi0 for " <br />p " n <br /> <br />A mina ra> <br />3.00 " . <br />D .~ „ <br /> 1 tim:oermatt, ~}.00 " D " '~ <br /> <br />at 1BaEt ~ t ramrne rs <br /> <br />e <br />° n <br /> r <br />i ore sort <br />rs, 3.00 ° p ~~ n <br /> <br />" 1 biacksmitir, •4.00 " D ~~ n <br /> 1 i oren>dn, ~4, 00. <br />lorry 2 eupti 7.00 <br />. <br />' teers <br />~` > 4.00 and ~}, 50 for12 hour shift. <br />e to <br />aouse /werap;e number o1' men employed for the <br />y <br />ear, 30. <br /> Cost:- <br />Cost of fuel 577.00 per ton. Averap•e rost pe:• month, !;2250.00 <br />Cast of timber, 20.00 per M. Averap;e cost per month, 5PG0.00 <br />Cost trans portiuF; supplies to : ine, 74.00 per ton. <br />Cost par tun, transportinE ore to railroad, 5?2.50, and to market p2. <br />Cost per ton treati:ent of.' ore, wD.00 <br />'~.~I;',,.. <br />a <br />