My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK01081
DRMS
>
Day Forward
>
Mine Books
>
MINEBK01081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2009 3:35:26 PM
Creation date
11/18/2007 12:26:43 PM
Metadata
Fields
Template:
Mine Books
County
Hinsdale
Volume
15
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3"l3 <br />Sunflower -4, <br />MINING, 2c ES I N F IS E T ]i O D S, Contin.- <br />at the present time is running the main.tunuel ahead so as <br />to get ender the shaft and there vrill be an upraise m¢de to <br />connect vritlr said shaft, a distance of 200 feet. <br />The method of ore extraction is over hand stoPing and <br />drifting with air drills, Ingersoll drills being used. <br />The method of timbering is stul'_s and square sots <br />covered vritir lagging and are sufficieht to secure safety. The <br />timbers are pine and spruce prepared by ]rand. Under ground <br />trarmnixig is done by trend. Steel cars nre used far tramming. <br />Chutes are loaded by hand and by gracity. <br />t. i The systom of ventilation is partly natural assisted <br />~ by a fan. All ol~htimbers have been removed from under <br />~~ I ground and the sanitary conditions are good. <br />Candles are use~,for lighting under ground. <br />nc <br />' Tkra mino has only ono exit 4t the present timo. There <br />ror~ <br />are no buildings near entranco to t;unucl, The shaft is <br />divided into two compartments vrith a good manway, ono s14e <br />witk: Js.dders with landings 20 feet apart. <br />S T A T I S T I C S. <br />':oral nutnber of feet in shafts, 260. Cost per foot ypIO, <br />n n u n n drii'tis, I400. " " " ;pI2. <br />n u u u u Cr06nCUtn, 500. u n u ;CIO. <br />~~ ~~ ~~ ~~ ~~ developmont work, 2I60. <br />Cost of povrder, IGF/ per pound, <br />i Coat of tranaportYrtr>, supplios, apI0.0U per ton. <br />Averugo auuay v41uc or oro, 25.00 Per ton. <br />:!en bmployed, <br />ii I m40hir10 drill man, .Fr4,00 for 6 hour shift, <br />~~, I maohina helper, ,p0.50 " " <br />u ~i u u <br />2 tranunofs, ~f3.00 <br />! I 14b0 ref, tp3.00 ° ° ° <br />I engineer, ~p4.00 " " "~ " <br />
The URL can be used to link to this page
Your browser does not support the video tag.