Laserfiche WebLink
nt <br />-3- 343. <br />Cost of fuel $9.25. <br />Cost of transporting ore per ton to railroad^p2.oo. <br />Cost of ore treatment x`5,00. <br />Cost of milling about jkl.oo. <br />MEN E}_'.PLOYED. <br />4 machine dr17.1men ~4.0o for 8 hours. <br />3.50 " " <br />8 shovelers <br />3.50 " " ~~ <br />2 timberman <br />3. oo " " '~ <br />h trimmers <br />3.00 ° " n <br />5 traclcmen <br />3.0o u n n <br />3 laborers <br />4.50 " n u <br />3 engineers <br />4.00 ° u u <br />1 blaclcamith <br />5. on " " ~~ <br />1 foreman <br />Aver¢ge number of wren employed 30. <br />OE NERAL RE 7±1AP 1C S. <br />1do Person under the age of twelve years are employed in the <br />mine. Strangers or visitors are not allowed underground un- <br />less accompanied by a competent guide familiar with the mine. <br />The management is supplied vrith blank accident reports.dll <br />accidents have boon reported to the F3ureau of ldines.The tunnel <br />is provided vd th one set of iron doors fixed in accordance with <br />the directions of the mine inspector at a roaaonable dlatance <br />from the entrance. Surface trtu~sportation is done with toams~ <br />there is a good wngon road which connects Lhe mine and mill <br />with Ohio City. The mine carries indemnity Snsuranre against <br />accident in The Oee¢n, The upruise to the surface will be of <br />four compartments. An upraise Ss being driven to surface n dis- <br />tance of 1250 feet from N0,7300 level. <br />1 <br />I~III <br />i ~, <br />I~j <br />i <br />~~~ <br />i. <br />I~ . <br />;III <br />II <br />