Laserfiche WebLink
<br />5TA71~TIC~"' ` ' ' <br /> <br /> <br /> <br />~~ <br /> Produetion~ £~- <br />~ °" <br />~"' <br />` <br />1 <br />• ,- Average tonnage per• month. <br />7 <br />- 30 tons. <br /> Total ado. of feet; in shaft (~00 Cost per• foot.~20.00 <br /> Total PIo: of Peet: in etopes? 1000 ft." " <br />8.00 r <br /> " " " ^ development. ],600 <br />I <br /> . <br />~_ _~ Men Em to ed_ ~ ;' <br />~ <br /> _ <br />i <br />3 1Siner~ ~3~ for 8 hrs, s'riift. <br /> 1 Engineer: '4 ;, , <br />' <br /> " , <br /> <br />~ 1 Supt. Lessee=: ~~ <br />~: <br />' ~ The average number of men employed for tho year is ~' <br /> 5 , f'aur underground r,nd one on the surface,, u <br /> . <br />Coat of fuel (coal) ~6.75~ per.• ton avers ~ <br />g ,~ per.• month $30.00 ;; <br />''t <br />i? <br /> " • " t17R179r 25.00 " 7~, n i, " " 3 <br /> " " powder ',y <br />!i°l4.00 per Ckv~t. " ~i " " ~F2.00. <br />The average assay value ore per ton. $0,00 <br />chat mf ore transportation by wagon. T5 <br />coat ore treatment and freight 10.00 <br />r^ <br />i <br />~, <br />it <br />