Laserfiche WebLink
leaite <br />tia~r <br />SURFACE PLANT. <br /> <br />5 <br />There are three boilers; two 267 H, P, and B, &, W, make <br />and one 150 H. P, and Heine make. The water used in the <br />boilers is from Altman and pressure carried is 120#. <br />There are two steam engines; one to run dynamo <br />and one to run the machinery in the machine shop and <br />one at the washing plant. ~ ~~~~ <br />There is one Laidlow, Dunn and Gorde~. Auk s one <br />150 light plant, The fuel used is coal, <br />At No, 1 shaft there~is Webster Camp and Lane <br />hoisting •~~,„~;y_and~ 20"% 48~~t:~. , <br />At No, 2 ahafppt there is•a Flory, geared hoist 12 R 14. <br />The hoist is equipped with a positive indicator <br />in plain view of the engineer and he operates at the <br />engine. The ages of•the engineer's is 28 to 50 yrs. with <br />5 to 25 years of experience. . <br />The abaft house is a wooden Bldg., 28 R 48 feet, the <br />engine room is 34 % 48 brick Bldg. ' <br />The head frame consists o~ four posts 12 R 14 R 60 feet <br />high, ,, The sheave wheel is 5 ft., turned groove. <br />The .Smith'g ,shop is 28 .R 38 wooden Bldg. <br />,l ...... <br />The Carpenter shop .is 20' A 30 feet wooden Bldg. <br />The machine shop is 18 7C 28 feet wooden Building. <br />The working shaft, furnace room, blacksmith shop <br />There is°auitable protection against fire, The dry or changing <br />house is 1$ % 20 feet wooden Bldg. <br />The cpmpreasor room is 28 R 54 ' wooden Bldg. . <br />The boiler room is 28 % 54 Feet, wooden Bldg. <br />1> <br />There are six ore bins and the ore house is 28 % 72 Feet. <br />The water supply is,from The mine-and from the Altman <br />ter Company, The lighting is by means of electricty. <br />The surf ce.transportation is M, &. T. & F. &. C. C. • <br />There is a wa on road to the mine. <br />The method of ore treatmetit'ia"smelting and Milling. <br />1 <br />The mib,~, has no mill. or reduction works. <br /> <br />~.'.i _ _ L.;__ _. <br />1 <br /> <br />