Laserfiche WebLink
<br /> <br />;:~y <br />ne average tonna6e per month is 250 tons <br />evelopment.-- <br />he total number of feot in shafts is about 700 coat per foot X20.00 <br />"• " " " "drifts -oP levels- 700" " ," 8.00 <br />he total i1o. of feet in development ---------------1400------------- <br />1~en Employed. <br />o. Employed. <br />^ ~ <br />5 ldachine men ,~ ,"74.00 • for e10•ht Era. shift., <br />2 loners 7 3.00 " " " " <br />3 Timberman " 3.50 " " n n <br />Z: tramrners " 3.00 " " " " <br />Z Ore Sortet•s " 3.00 " " " " <br />1 TOrman " 3.~0 n n n n <br />2 Engineers " ~~; 00 " " " " <br />1 I31arl:emYth " X3.00 " n n n <br />1 "r_elper " 3.50 " " " " <br />2 Foremen " 4.50 to G.00 " " " <br />1 Superintendent. (Less en) <br /> <br />The average numbe:• of men omployed fo r tho year is 25-19 , <br />unde r ground and G or. the surface. <br />Cost of fuel (coal) w4.65 per ton average per month y~150.00 <br />Coat of timber 25.00 per•1d. " " " 250.00 <br />Cost of ateol £ij! per Lb. " " " 10.00 <br />Coat of oil 55~ " Gal. " " " 5.00 <br />Cost of powder 12.15 "Cwt. " " " 300.00 <br />Aver age value ore per ton 30.00 <br />Cost per ton for transportin g ore ) <br />8.85• <br />Cost per ton fot• the treatment of ore ) <br />'i <br />^ <br />•:. <br />