My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK01047
DRMS
>
Day Forward
>
Mine Books
>
MINEBK01047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2009 2:17:45 PM
Creation date
11/18/2007 12:25:35 PM
Metadata
Fields
Template:
Mine Books
County
Teller
Volume
10
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fiti <br />.. ` ~. - '.. n. <br />-:3 <br />MINING ~ MINE METHODS--.Concluded. <br />~'.'`. <br /> <br />r <br />Landings are provided in ladder-way not to exceed <br />20 feet. apart. There are winzes or man-ways connecting <br />levels, ana at least one man-way is kept in repair: and <br />equipped with ladders.. <br />The ma.n;a has more than one. exit for employes.; ,it ' <br />is connected with the Hull ,City on the 8th, 9th and <br />10th levels, Christmas and La Ba11a on 500 and Golden. <br />Cycle on 10 and 1100 ft. levels,, and i accessible to <br />employes. <br />Lighting system employed underground, electric <br />lights on stations and candles in all drifts and topes. <br />STATISTICS. <br />„ <br />DEVEBO?'MEPdT . <br />Total. No.ft.in shafts,.6,714.. <br />Total 1Po.ft. in development 25":56 miles. ' <br />LABOR. Hull City and Vindicator. <br />46 machine drillmen, 4.00 per day of 8 hours. <br />25 timbermen,_ 3,50 " „ „ 8 r, <br />$2 tralLtll~r3, 3.00 'r n n $. „ <br />6 topmen, 3.:00 ,. " " 8 „ <br />3. assayers, 5,00 and 2.5D a day"for month. <br />4 fireme¢, 3.5D per day oY 8 hours, <br />7 engineers, 4.50 " " " g " <br />3 ~1zmPmH$. 4.-00 n " " g " <br />6 blacksmiths, d,pp rr " n. 8 " <br />4 foremen, 4,50 ,r ,, „ 8 <br />l superintendent ~400.OD per month. <br />1 o3fice help, 125,OD " " <br />3 pipe fitters, 3.50 per day of 8 hours,- <br />2 iaaster mechanics, 5.00 " 'r 8 ++ <br />Average number of men employed for the year, 144-107 <br />underground and 37 on surface. <br />COSTS. " <br />Cost of fuel X3.10 per ton,. average cost per mo. ~2,8D0. <br />Cost of .timber about ?~30.per III. " " " 600.. <br />Cost of steel B-1/2y~ per lb. " " 40. <br />COBtoi' Oil, 48 " .gal. n n " " 4O, <br />Cost of powder,12,00 per evat. " " " " 2 200. <br />, <br />Average"assay value ore per ton, 41,00 for 1907. <br />
The URL can be used to link to this page
Your browser does not support the video tag.