Laserfiche WebLink
<br />The power-plant consists of onP 30 ~.:P. Fairban?cs- <br />t:oxse boiler. rater is obtained from .the Altman 47ater <br />~?? <br />Company. Pressure carried, 80 poands. Boiler last.in- <br />speeted in July, 1907... <br />Character of fuel used, Coal. <br />Hoisting plant consists of one steam hoisting engine; <br />Fairbanks-Morse 6 % 9- <br />Hoist.is equipped with positive indicator in i>lain <br />view of engineer. ?'nine is operated by hoisting engineer <br />at engine. engineer is 45 year old .and has had eleven <br />• years' experience as an engineer, and he is not addicted <br />to the use of intoxicating licruors. <br />There is no shaft house. The .engine room is frame <br />16' x 26'. The head frame consists of two posts B" X 8" <br />and is 24 ft: high .and is provided with a 35 inch, rope <br />filled sheave wheel. <br />Collsr of shaft where bucket is used) is of suffi- <br />dent height to .prevent .:persons from .tripping-and fall- <br />E <br />ing in shat, and is provided, with a good and sufficient <br />door to prevent any met.Frial from falling in the shaft #;; <br />fror.^ dumping. ~ II <br />.The blapksmith's shop is frarre 20` X 30'. <br />The protection provided against fire is only fair. <br />rater supply* is obtained from the Altman Plater Co. <br />The mine is raachad by a good. wagon road. <br />The smelting method of ore treatment is employed.' <br /> <br />