Laserfiche WebLink
Table Three <br />Cost Suaunary <br />Labor and Overhead $7,536.00 <br />Direct Costs 2,276.50 <br />9,812.50 <br />WHS Fee 25.00 <br />TOTAL PROJECT COSTS: $9,837.50 <br />19 <br />