Laserfiche WebLink
{I <br />t <br />i~ ,' <br />~ p <br />U <br />i <br />~I~ <br />ii I ' <br />,la <br />~I <br />~~ <br />''. <br />h <br />,~.. <br />~~~,. <br />I1 ,. <br />?I <br />i <br />;I <br /> <br />~ ~ 1 <br />I <br />~~, i <br />~i iai iac Axn M i NF_].c~ Tx o n s. <br />Tha gain opening is composed of four tunnels, rhlcln::ruri in <br />2500 <br />distances Prom 2E to 3809 Peet on comber one, three &-, <br />Your. Number Prn~r ttmnel is run in from top of mill <br />Yor a distance of about 2600 Peet. T1iia la where moat <br />- oP the mining is carried on at the present time. <br />k!ining is done eith machlne stopera, overhand atop- <br />ing with filled stopea. The nethod of timbering is <br />mostly stalls corered with lagging. The timbers era <br />spruce ~ d plus prepared by hand. Underground tram- <br />- ming is dons br horse and hard, The syatea of venti- <br />lation is natural. Ali =e~ele are connected by good <br />la4der wapa and ladders are not orer twenty feet <br />apart. The mine has Pour exit», through the diPPer- <br />ent tunnels, Candles are used Por lighting under- <br />ground. <br />STATI STI C S. <br />Average tonnage per month ?.000. <br />Total number oP feet in kunnele 4000, Coat per it. $7,0. <br />Total number of feet in fl rlfta 10325. Co»t per ft $10. <br />Total number of Peet in crosaeut» 500. Co»t per Pt $15. <br />Total number of feet in ra!»e» 975, Copt per ft. $10, <br />Average co»t of timber per month $400. <br />Average co»t oP »teel per mont $20, - <br />Average co»t oT oil Per month $7,0, <br />Co»t of powder $a 17 por pound. <br />Averagg a»eay v» hi9 $5.00 <br />C o»t Per ton mining oP ore $1.00 <br />Co»t par ton transporting ore to mill $,25 <br />Cort per ton ore troatrn9nt $,75, <br />!( F N F IA P L O Y F D <br />0 machino Qr1lLnen $. <br />x.75 for 8 hour», <br />L machine helpers L.50 <br />8 miner» L.00 ^ <br />1 timberman <br />9.00' <br />L tremmer» <br />L,00 a <br />2 laborers <br />E.00 r <br />