My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK01033
DRMS
>
Day Forward
>
Mine Books
>
MINEBK01033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2009 2:15:19 PM
Creation date
11/18/2007 12:25:05 PM
Metadata
Fields
Template:
Mine Books
County
Teller
Volume
13
Document
Inspectr
Suffix
B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r r- <br />~ _i a <br />" ~% 4 <br />~~ <br />`Dross°cutting 250 ft;-11th level, 1300_ft, Dross cutting <br />275 ft;,l2th:level, sloped out inaceeasible;:l3th level <br />250 ft, sloping 150 ft, Bain abaft timbera•with 8•X.8.._ , <br />squsre.sets,in_fairiy good shape. The head frame is a <br />12 X 12~ 60 ft,~ high, 6 ft. sheave hlopk .filled., <br />An additional exit 4tas beea•provided through 8 <br />drift run about 400 ft• from the shaft ~rhieh connects <br />crith No. 2 ahaft,on the 400 ft• level. Exit in good repair <br />and. properly equipped. <br />}io.2 shaft is equipped with an 80 H.P. Upright <br />tubular bcller;pressure carried 60~1bs. Donrt knovr when <br />boiler was inspected. Seems to be 1n good shape.Steam <br />engihe, 7 R 10 Fairbanks and l{orse make.,:fuel used coal. <br />Hoist oquipped with everythiTtg but an Indicator. In <br />this shaft they hoist about 1 or 2 days in the nonth. <br />Shaft house frame; 20 X 40 covered With iron roofing. <br />Headl2~eme 8 X 8, 22 ft, high, 3 ft, flheave wheel,rope <br />filled. Collar of shaft auffi~siently high to prevent <br />persons ~ material from falling in shaft. Is provided <br />with good and sufficient chore: Blaekan:ith shop in <br />shaft house;also•fl~rnace room.•SUitable protection against <br />fire is not provided. No 2 +shrrft 500 feet deep, r.~it~ <br />drifts es folloRS:r.. ' <br />consists of flue levels with a total of drifting <br />of 2500 ft• Cross cutting 800 ft. in the let, 2nd and <br />3rd levels. method of ore eztraotion,maohino drills <br />in both shafts. <br />ALL Underground tramping is done by hapd with steel <br />cars of the line k Smelter type. The trackage is 18 inch <br />gauge,and 1?. lb T rail. Chutes are loaded by hand arm , <br />gravity. The synter of ventilation is natural. All <br />old timbers have been rettuved from underground and the <br />sanitary conditions are good. Cendlea are used For <br />lighting underground. Shaft is divided in to 2 oompart- <br />meflta, with good and aufi'ioient ladderwaya provided. <br />.t <br />.STATISTIC::. <br />Total musbr,r of feet in shafts 1806 ft. <br />Total Wernher of feet in drifts 12705 ft <br />Total number of Dross cuts 17580 " <br />Coat oY fcot of davtllopment cannot he given as the • <br />work has boeit done try a number of dlfl'ar+.nt parties <br />Oost of Poxdbr ,12-1~2 ota Pin Pound, averaP.e Per <br />month $50.00 <br />Coat of luel pee' ton $5.30,avnreges coat PU"=r-~onth <br />100,40 <br />CJSt •~t :c r. of trinirig ore $5.00 <br />Cost of tranaYgrtation rror $1. t0 $3. Pe'r' tan <br />Cont of treatment ore Der' ton from $3. to $6. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.