Laserfiche WebLink
<br />C~., <br />F>`. ~: <br />HOISTING PLAN'.' Method steam; man are raised and <br />la~rered with hoisting maehiner~; weight cf load of <br />load .hoisted about 2,500 lbe. distance of 700 ft. <br />Cable is .8 7~8" Robling,and has been in use 2 years. <br />The:festeninge.are clamps; samo ohanggd about two weglca <br />ago. Cage is equipped with bonnet and safety oluthhes; <br />which aro teated.three times a week. No dafety devioe is <br />employed to prevent overninding. liaterial is hoisted from <br />two levels. 5~8" ltenilla rope bell line vrith 12" gong; <br />State code of signals are employed and is posted in engine <br />i <br />room, at collar of shaft and 111 esoh level station. <br />per sons are prohibted from riding on loadod oage and . <br />notice is posted at aoliar of shaft,aa also Ss notioe <br />stating the maximum number of men Permitted to rido on <br />oage,at oollar of Rhaft.and at esoh level station. station <br />ohaira are employed Cage guides are 4 X 4 Oregon Pine <br />' is1 good condition. All level stations are provided with <br />peasagexaya arouna xorking ahaft,and all stations ar© <br />provided with guard rails,and shaft is seour~d trj pillars <br />i of ground on esoh alde suffiolent to lneur"e eafoty. A11 <br />slnsos and mi12 holes are aecus•e1Y covered. shaft la being <br />ausOc and ueti ere provided with chain or othor sufficient <br />ladder a. Bulkhead is Planed ovur nYtaft pan. <br />1lINT. YSTHODS, overhat'~d stoylnC+ fiilu3 ntopea; mr~ohine <br />drills ere ea~loyrd Pi+tton and Har~er% no hand drii]ing; <br />t~yb~.~ is done tiSl stu111ng and iegging aM la esuffiolent. <br />ti~h~e used nativo apruoe and Pine In their natural ,:tNte. <br />Condition of tit:t%~+='s -`ai~'• Chutua era loader! tT! gravity <br />sat hai-d• UMergroT~d tram~ing+ b! epra and traok, ohloh <br />lei a 12~ T. Tall~•18' gygue • TraokaZb 2+000 ft: <br /> <br /> <br /> <br />