Laserfiche WebLink
.. s _ '; _ <br />_ ., a ,, <br />_ • L _ _ _ <br />' t .:1 <br />~) .1~ry <br /> <br />~ ~ <br />~ ~~_- <br />i <br />~ Sotal number of Yeet 2n Dross onto <br />2500 ft <br />Coet_per,.Poot =10.00 ~-- <br />Total number of feet in ninzes and raises 3,000 !t <br />.Coat per foot =7.50 <br />Total number of feet Sn development work 13560 it. <br />YE2i S!(PLOYEDI <br />I <br />~ 7 kaohise Drill men 8 hours at 4.00 <br /> <br />. 3 miners ^ <br />I <br />• 3.00 a 3.50 <br />' 5 Timbermen • • 4.00 ac 5.00 <br />4 Trea~ere " 3.00" <br />~ 5 Ore sorters • • 3.00 <br />j ~ 1 Top man -3.00 <br />j 3 laborers • • 3.00 <br />1 assayer • 5.00 <br />I <br />1 engineer • <br />• 4.50 <br />~ 2 Biaokamiths • • 3.50 a 4.00 <br />~ 1 foreman <br />i ~ 6.50 <br /> <br />1 OS"PiOe man • <br />~ <br />• 4.00 <br />; <br />Arerage number of 1:,en elrployed for she year ' 25. <br />Coat of ttiei 5.00 per ton;average oost par month, ~b00.00 <br />Co et of t]mbers l0 ote per inoh;nv erage oost per <br />month :400.00 <br />i Cost of steel 9 ota per ib. Avera ge ooet par <br />month ~loo.oo ~ ' <br />Coat of oil, average oost per month /60.00 <br />Cost of ponder 12-12 ota per ib; average ooat <br />per month ;600.00 <br />Arezage assay value of ore =20.00 <br />Cost Per ton mining ore =7.00 <br />Oo~t pvr•ton transporting ore'Sl. to =3.00 <br />Coat per. ton treatment of ore i3. to ~b.00 <br /> <br />OxyYIUL RIyApX6. <br />11o persons undo= the •s¢e of 12 years are <br /> ~ <br /> <br />