Laserfiche WebLink
STATISTICS. <br />DEVEDOPMENT . <br />Total No. ft. in tunnel, 1350, Coat per ft. X15.00 <br />,, levels, 300, 6.00 <br />„ development 1650 <br />&SEN EP.~DOYED. <br />2 machine drill men, X3.50 per day o~ 8 hours. <br />2 helpers, 3.00 „ „ p <br />„ <br />2 trammers 3.00 p <br />.> ,. „ <br />1 blacksmith 3,50 „ 8 <br />„ <br />COSTS. <br />Not given, as the work is done by contract. <br />