Laserfiche WebLink
SURFACE EQUIPMENT. <br />The surface equlp:Lent is ae follows: <br />Engine roam, Bailer roam, Dry rcom and tunnel house. <br />Open are bin6 (from which are ie hauled by wagon to the railroad) <br />Powder house (Wand covered with iron) 200 average storage. <br />1 - 40 H.P. Horizontal tube boiler (carrying 40 lb. preeeure <br />for hsating bd~ldings only) <br />1 - 3 drill Leyner Compressor (electrically driven) <br />1 - 65 H.P. electrical motor (to drive compressor) <br />1 - 4 H. P. electrical motor (to drive pump, pumping water <br />(from ditch to large tank) <br />1 Feed pump (electrically 3riven) <br />2 Large water tanks (cap.1500 gal. each placed over boiler <br />(furnlehing boiler feed and fire protection) <br />Blacksmith shop (equipped with hand tools) <br />COSTS & STATISTICS. <br />Sinking shafts approx. X20.00 per foot. <br />Drifting or Crosaoutting X12.00 per foot. <br />Raising ~ 5.00 per foot. <br />Caal~(3 1~2 tan used per month) $b.00 per ton. <br />Powder (3200~F' DuPont Gelatine per month) X14.00 per owt. <br />Fuse (18000 ft. Hear Hrand per month) b0¢ per cwt. <br />( slabbed 10 in x 14 Pt. X1.15 each(average <br />Timber ( (coat por <br />( elabbed.l0 in x 18 ft. X1.26 each month $60.00 <br />( Compressor 76¢ per gal. ( Average <br />Oils ( Red Atlantis en ino b0¢ per gal. ( coat por <br />( Cylinder 011 86~ per gal. ( month X6.00 <br />Mining oro (60 tone per month nverage'.zinc ore 43.00 por ton <br />(Gald oro 6.00 per ton <br />Transporting ore 1.20 per ton <br />Smelting treatment Prom X4.60 ta~A.00 per ton. <br />Labor <br />1 Superintendont ® $6.00 = X6.00 <br />1 Foreman ® 6.00-= 6.00 <br />1 Maohine Drillman @4.00 = 4.00 <br />8 Miners ® 3.00 = 15.00 <br />3 'Prammore <br />2 Ore Sortore <br />1 'Pop Man <br />® 3.00 = 9.00 <br />® 3.60 = 7.00 <br />1~5 3.00 c 3.00 <br />?. Enginsers ® 6.00 ~ 6.00 <br />1 Blaoksmith ~ 3.00 <br />1 Oftioe Man A 3.00 = <br />`' <br />j; <br />,. <br />