Laserfiche WebLink
I ~? 1!IL13f1[I>tlllfHl~-1! <br />are about 1420 feet of shafts, 10000 feet of drifts and levels ~ <br />i ~I' <br />I <br /> <br />and <br />3000 Peet of raises and winzes. ~ <br />~ ~~ <br />~~ i <br />~~~ <br /> <br />I <br />~ 1. <br /> The shaft passes through the parting quartzite between ~I <br />I ' '` '•~ <br />4 <br />the second and third levels, but the drift to the east on ~ <br />I ; ,I „ , <br />~ 1'IS . <br /> s; i, G <br />~< <br />third level passes through the parting quartzite again on '§~i <br />} ~ , <br />~ ` <br />I i'h <br />its dip, all the stopes being in blue lime. <br />~ I <br />~(I <br /> UNDERGROUND EQUIPMENT. ~~F ~I ~~ ~~ ICI <br /> ~~i ~~' <br />~ <br /> Electrical lighting system, ~ ' 1 <br />~ <br /> (all fitted with Whitney Roller i~ 1 <br />:~ <br /> Regulation tram aars(Bearing Wheels mfg. by the 7 II l <br />I <br />+ <br /> (Sanford Day Iron Works of Tenn. ~ j <br />l i <br />I <br />I <br />i <br /> 12 ib. rail, 18 in. gage track, : f <br />I t <br /> (1 Water Leyner, ~ ' 'r' <br /> 7 machine drills (1 Jaak Hammer, ' <br />i <br />' <br />I <br /> ((1 Waugh Plugger, ~ ;~ : ! ; , <br />} <br /> (3 Waugh Stopers, ~ ~ i ?'. <br />' <br /> (1 Ingersoll Rand Stoper. ;~ ~ i ~ `I :, <br /> <br />i SHAFT EQUIPdEN <br />I <br />: <br />i~ ' <br /> <br />Cago and skip (interchangeable and equipped with safety <br />~ , <br />~ <br />' ~~ <br /> (clutches) <br />~ <br />~ <br /> <br />7~B wire hoisting cablo (good Gondition,faetened to cage <br />i ' <br />, <br />I , , <br />' <br /> with alampe) , <br />I ,S <br />~'1 <br />~ <br />~ Hardwood guides, i ~ ~ , <br />~ <br />~', ~ <br /> Head frame (made oP 12x12 timbers, 40 ft. high), I ! <br />: <br />d'~{ <br /> r <br /> Iran sheave wheol (3 1~2 ft. dia.) <br />il ~~.,~ <br />k <br /> Woven wire bell cords (good) <br />~ ''~I <br />l; <br /> ;' ~, <br />~ ; <br /> Ohaire and gaurd rails at surface and stations, ~ ^ <br />I fl <br /> SURFACE EQUIPMENT. , <br />i.l I <br />p ~ I+. <br /> <br /> <br />' i' <br />~ <br /> Shaft house, <br />~~ ' <br />l <br /> i I <br />: <br />1 <br />,~ <br /> Ore house and dig room, ~ ~r, lil ;~~ <br /> ! ~ I ' '' <br /> Engine room, ~ <br /> Blacksmith shop (forge oquipped with both blowor and <br />ir) <br />d ~ <br />i j, , <br />~~ . <br />~' <br /> a <br />r <br />compresse ~ I ~ <br /> <br />Off ice and testing laboratory, ~'~ <br /> <br />I~• <br /> Dry room, 9 ~q ~ I '' <br /> Powder house ( wood oovored by eheot iron about 300~~ t , ~ ,I <br />I <br />~~I <br /> serried in storage), ~, , <br />li S x 10 doubie cylinder hoist~at Y7nterloo Shaft, ~I <br />li p <br />P <br />p <br />'~ <br /> 10 x 12 double aylindor hoist at No. 6 6haft, I <br />, <br /> err in 90 lbs pressuro) <br />SO H.P. Tubular boiler (o Y g 1 <br />~. <br />i <br /> Rand Imporial Typa 10 compressor, f <br /> E. Motor (far ao^~proeeor) <br />O <br />100 H <br />P <br /> . <br />. <br />., <br /> 20 H.B., O. E. Motor (for dig) I <br /> • 10 H.P.,W. H. Motor (for trommel), i <br />