I ~? 1!IL13f1[I>tlllfHl~-1!
<br />are about 1420 feet of shafts, 10000 feet of drifts and levels ~
<br />i ~I'
<br />I
<br />
<br />and
<br />3000 Peet of raises and winzes. ~
<br />~ ~~
<br />~~ i
<br />~~~
<br />
<br />I
<br />~ 1.
<br /> The shaft passes through the parting quartzite between ~I
<br />I ' '` '•~
<br />4
<br />the second and third levels, but the drift to the east on ~
<br />I ; ,I „ ,
<br />~ 1'IS .
<br /> s; i, G
<br />~<
<br />third level passes through the parting quartzite again on '§~i
<br />} ~ ,
<br />~ `
<br />I i'h
<br />its dip, all the stopes being in blue lime.
<br />~ I
<br />~(I
<br /> UNDERGROUND EQUIPMENT. ~~F ~I ~~ ~~ ICI
<br /> ~~i ~~'
<br />~
<br /> Electrical lighting system, ~ ' 1
<br />~
<br /> (all fitted with Whitney Roller i~ 1
<br />:~
<br /> Regulation tram aars(Bearing Wheels mfg. by the 7 II l
<br />I
<br />+
<br /> (Sanford Day Iron Works of Tenn. ~ j
<br />l i
<br />I
<br />I
<br />i
<br /> 12 ib. rail, 18 in. gage track, : f
<br />I t
<br /> (1 Water Leyner, ~ ' 'r'
<br /> 7 machine drills (1 Jaak Hammer, '
<br />i
<br />'
<br />I
<br /> ((1 Waugh Plugger, ~ ;~ : ! ; ,
<br />}
<br /> (3 Waugh Stopers, ~ ~ i ?'.
<br />'
<br /> (1 Ingersoll Rand Stoper. ;~ ~ i ~ `I :,
<br />
<br />i SHAFT EQUIPdEN
<br />I
<br />:
<br />i~ '
<br />
<br />Cago and skip (interchangeable and equipped with safety
<br />~ ,
<br />~
<br />' ~~
<br /> (clutches)
<br />~
<br />~
<br />
<br />7~B wire hoisting cablo (good Gondition,faetened to cage
<br />i '
<br />,
<br />I , ,
<br />'
<br /> with alampe) ,
<br />I ,S
<br />~'1
<br />~
<br />~ Hardwood guides, i ~ ~ ,
<br />~
<br />~', ~
<br /> Head frame (made oP 12x12 timbers, 40 ft. high), I !
<br />:
<br />d'~{
<br /> r
<br /> Iran sheave wheol (3 1~2 ft. dia.)
<br />il ~~.,~
<br />k
<br /> Woven wire bell cords (good)
<br />~ ''~I
<br />l;
<br /> ;' ~,
<br />~ ;
<br /> Ohaire and gaurd rails at surface and stations, ~ ^
<br />I fl
<br /> SURFACE EQUIPMENT. ,
<br />i.l I
<br />p ~ I+.
<br />
<br />
<br />' i'
<br />~
<br /> Shaft house,
<br />~~ '
<br />l
<br /> i I
<br />:
<br />1
<br />,~
<br /> Ore house and dig room, ~ ~r, lil ;~~
<br /> ! ~ I ' ''
<br /> Engine room, ~
<br /> Blacksmith shop (forge oquipped with both blowor and
<br />ir)
<br />d ~
<br />i j, ,
<br />~~ .
<br />~'
<br /> a
<br />r
<br />compresse ~ I ~
<br />
<br />Off ice and testing laboratory, ~'~
<br />
<br />I~•
<br /> Dry room, 9 ~q ~ I ''
<br /> Powder house ( wood oovored by eheot iron about 300~~ t , ~ ,I
<br />I
<br />~~I
<br /> serried in storage), ~, ,
<br />li S x 10 doubie cylinder hoist~at Y7nterloo Shaft, ~I
<br />li p
<br />P
<br />p
<br />'~
<br /> 10 x 12 double aylindor hoist at No. 6 6haft, I
<br />,
<br /> err in 90 lbs pressuro)
<br />SO H.P. Tubular boiler (o Y g 1
<br />~.
<br />i
<br /> Rand Imporial Typa 10 compressor, f
<br /> E. Motor (far ao^~proeeor)
<br />O
<br />100 H
<br />P
<br /> .
<br />.
<br />.,
<br /> 20 H.B., O. E. Motor (for dig) I
<br /> • 10 H.P.,W. H. Motor (for trommel), i
<br />
|