Laserfiche WebLink
~STATISYIGS: ~---- <br />Total namber of feet in shafts, 1000, Cost por ft,$30.00 <br />" " " in drifts or levels, 1500, Cost per <br />foot, $10.00 <br />" " " ^ in cross-cuts,350, Cost per foot, w10.C0 <br />" " " " in win2es and raises, 20~, Cost <br />per foot, X10.00 <br />" " " in development, 3050. <br />j 7.abor. <br />Ao. Enployod. <br />1-E;aohine Drillman, $6.00 for © hour shift. <br />1-Tranmor, 3.00 " B ^ " <br />1-Engineer, 4.00 8 " <br />1-Blacksmith, 4.00 " • 8 " " <br />1-Superintendent, 5.00 <br />The average numb or of men employed for the year is 5, <br />2 underground and throe on the aurfaeC. <br />Cost. <br />Coet of coal is .^;5.50 por ton, hve. cost por month y195.00 <br />^ " steel is 99 per lb, n n rr n 5.C0. <br />" "Oil ie 50g per gFl., " " " " 5.00. <br />" " p041der ti 13.50 por Cwt , " " " " 60 .00 . <br /> <br />