Laserfiche WebLink
~STATISTICS.~~' <br />Development. <br />i Total numbor of foot in shafts is 1205, Cost per foot X15.00 <br />Total ;To, of feet in drifts or levels is 1100, cost per ft, <br />is $8.00. <br />Total I:o. of Yeet in cross cats, 400, cost per ft. ':.`8.00 <br />Total Fo. ft. in winzos, 2p, cost per foot ~©.00. <br />Total 2io, of feet in development 2728. <br />i <br />habor. <br />No. Employod. <br />1-3Saehine irillman, X4.00 fnr 8 hour shift. <br />1-Trammer, X4.00 n n n n <br />1-Engineer. ;4.00 " " " <br />The average number of men employed for tho year is trroe. <br />2 underground, and one on tt:e surfaco. <br />Cost of fuol (coals is `'6.50 nor ton. hue. cost por E'o.v40. <br />Cost of rorrdor,12,50 nor curt. Lvo. cost per mo. fi90.00. <br />The average assay valuo of the ore is $25.00 por ton. <br /> <br />`~ !lfi~ <br />fl,. <br />. ;; <br />'' <br />~' <br />~~ <br />r;i <br />~, <br />I' <br />,, <br />;i <br /> <br /> <br /> <br />~i <br />