Laserfiche WebLink
SUpFACE PLANT, <br />Power Plant. <br />One iconomic 25 R,P, boiler is used. <br />Lane vm ter is used .in the boiler, 80 pounds pressure. <br />j is carried. <br />I cannot say when the boiler was inspected by the State <br />Boiler Inspector. <br />', Hoisting Plant. <br />One 6 x 8, Fairbank, f.'orse flat friction, steam hoisting <br />engine is used. <br />The hoist is equipped with positive indicator in <br />plain veiw of the engineer. Re operated the engine <br />at the engine. The engiaear is 40 years old and has <br />5 <br />had 10 years experience as an engineer. de is n66 'f~ <br />addicted to the use of intoxicating liquors. <br />Shaft douse. I' <br />There is no shaft house. The engine room is a frame <br />building, 1G ft, x 2B ft. <br />The head frame conaiats of 2 posts, 8 in. x 8 in. 20 ft. <br />high, <br />The sheave wheel in a 36 inch repo filled. <br />The collar of the shaft ( where bucket is used) is <br />of sufficient height to prevent persona from trioping <br />and falling in the shaft, and is provided vrith a good <br />and sifficiont door to prevent any material from falling <br />in the shaft from dumping. <br />r <br />The Whop is a 12 Yt x 14 ft. Frame iuilding. <br />Tho Doilor Room is a 16 ft x 2d ft, " <br />Those are not under one roof. <br />Thoro is no Yiro protoctlon. <br />There is ono open Oro bin. Tho orator supply is obteine~l <br />from the r.1ne. <br />Oro Tr eatr;ont, <br />Tho ore is treated ty re~c~ of nnelting end Tilling. <br /> <br />