Laserfiche WebLink
<br />STATISTICS. <br />J <br />Tho avorage tonnage per month is 3 0 tons. <br />Total,no. ft. is shaft ~t50 C~ 25.00 por ft. <br />Total No. ft. in drii'ts and lovels +300 ~~ 5p7.00 per foot. <br />Total No. ft. wineos arui raises 70 (~) j0.00 por foot. <br />Total 'No. ft. in development 1h20 <br />1dD;pI A~4PLOYLD: <br />3 machine mon !~ {p4.00 i'or S hours <br />1 trammor C~ 3.00 " ^ ~ ~' <br />1 engineer 0 x.00 "" ~'' 'r~ <br />1 superintendent n h.50 per day. <br />Average no. mon employed G. <br />llnderground ~ <br />suri'sce 2 <br />G~ <br />C-oat oi' i'uol n G,00 per T''. A'verap;e cost per month ~75.00~ <br />Croat of timL'er G) 1.50 pet• 8" stick and 1G' lurl, per month 10.00 <br />~ Cost of steel 0 2Fi ~to 1.50 per ft. per month 5.00 <br />I Coot oi' 011 ~~ 65 per ~;al. por month <br />Cont. of pot~rder ~y12.50 per cwt. por month 60.00 <br />Averap;o asan;,~ value oi' oro pnr ton ;'"j100.00 <br />Cost per Lon treatsporting oro and treatment S?9.50 <br /> <br />