Laserfiche WebLink
-~- <br />Coat per foot $20.00. <br />Total number of feet in drifts or levels 9000 cost per <br />foot $10.00. <br />5ti~ <br />Total number of Peet in crosscut 1000, Coat per fmot $15.00 <br />Total number of feet in winzes and raises 1000 cost per <br />foot $20.00. <br />Total number of Yeet in deveiopement 12000. <br />Average tonnage per month 3000. <br />Average value of ore per ton $8.00 <br />Cost of mining. +ransporting and treatment $4.00 per ton. <br /> MEN ENP L 0 YE P. <br /> <br />5 ]dachine drillmen $4.00 for 8 hotira <br />25 miners 3.00 ~ <br />1 timberman 3.50 ^ <br />10 trammers 3.00 ^ <br />2 tramway men 3.00 ^ <br />1 blacksmith 3.50 ^ <br />1 foreman 5.00 " <br />1 superintendent 250.00 per month <br />y millmen 3.50 for 8 hoes <br />G E N E R A L R E M A R K S. <br />No person under the age of twelve years is erJployed in <br />this mine. Strangers or visitors are not allowed underground <br />unless aocompanied by a competent guide fr+milier with the <br />mine. Ail accidents have been reported to the Bureau of <br />Mines. The management ie supplied with blank accident re- <br />ports. The mine carries indemnity insurance again et <br />accident. The Ocean Accident and liability Company. <br />The tunnels are all provided with doors at a reasonab le <br />distance from entrance, to prevent admission of noxious <br />fumes or gasses from said buildings should fire occur. <br />Surface transportation is done by serial wire rope tramway <br />one connects mine with mill a d?stance of one mile esrd one <br />connects mill with D& R G S R R at Ophir Loop a distance <br />of two miles. There = is a 30 stamp mill with one large <br />Blake crusher and one Huntington mill with a wii!'!ey and <br />8 !'ue vannere there is oganide plant in connection ell <br />though not operated at present time. <br />