My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00944
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00944
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 11:10:09 AM
Creation date
11/18/2007 12:22:33 PM
Metadata
Fields
Template:
Mine Books
County
San Miguel
Volume
14
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-s-. <br />~. <br />~! <br /> <br />The powder magazine is a game builfling. The device for <br />thawing powder is a double hot water boiler. <br />MI:1I N G A8D MI1QE METH OD3. <br />The main opening is a croasaut 1000 Peet is length. <br />with a drift on the rein.1500 Peet to LTie east. <br />4lorL ie carried on at the present time in number 3 level. <br />Number 1 and 2 lerela are below nvoober 3. The method of <br />ore extraction ie drifting and ovezhand4etoping. Hand' <br />drilling is e~loyed, being single. The method oY <br />timbering Se drifts sets and cribbing.-The timbers are <br />white spruce prepared by hand. Loading chutes are <br />loacLed by grav"!ty. The system of underground tram;,ing le <br />by horse. The system of ventilation is natural. No noxi- <br />ous gases are met with.. The levels are connected by <br />man-°!+ys which are eouipped with ladders in good <br />repair. Each level le used as an exit. Candles are used <br />for lighting. - <br />S T A T I S T C S. <br />Total number of Peet SS1 tunnels 4000. <br />Total nur.~er of feet in crosscuts 1000 <br />Total number of feet in raises 600 <br />Total number oP feet in developement 2000. <br />MEN EM?L 0 YE D. <br />15 miners '#3.00 for 8 hours - <br />1 timberian 4.00 r <br />1 trammer E.00 r <br />1 TOpman 3.00 r <br />1 foreman 5.00 r <br />krerage assay value of ore per ton 40.00 <br />Coat per ton mining of ore #lO.OQ <br />Cost of transporting ore per ton $9.50 <br />Cost of treatment per ton ~.00. <br />Cost of powder per pound x.17. <br />GENERAL R°'MARR'S. <br />Nc person under the ago of 12 gears are eu~loyed in the <br />mine. No strangers or visitors are allowed underground <br />unless eocompanied by s ~myetent guide familiar with the <br />
The URL can be used to link to this page
Your browser does not support the video tag.