Laserfiche WebLink
MINING AND MINE METHODS. <br />The main opening on theproperty is the main cross-cut tunnel 5}:7 ft,th e <br />mouth of which is on tha north aide of wagon road on the Elizabeth lode, <br />The tururel has a northerly course mm~ing into V/ood hlountain,cutting the <br />Zopher vein at 900 tt.a::d the PranY,lin vein at 1200 ft. <br />}Jo examiruition was made of any workings other than tha main tunnel into <br />the Zopher vein and thosa on the same as there is no wor}: being carried <br />on elsewhere at the present time. <br />The Zopher vein has considerable drifting and stoping done on and above <br />the tunnel level. <br />The Zopher shaft on Zopher veirr~aouth of which is on tunnel level 75 ft, <br />west of point where tunnel cuts said vein,5R9 ft,two compartmentsrbucket <br />and ladder :cay,230 ft,deep,dippiag to the Morth at an angle of f;0°. <br />Shaft has levels at:- <br />SO ft.,extending east l0U ft.,and west 100 ft. <br />150 ii.,extending east 200 ft.,and west 125 ft. <br />230 ft.,extendirrg east 90 ft,,and west 75 ft. <br />F9orY, is being carried on at the present time do the 150 ft,level west <br />and the 230 ft, level both easi and west, <br />}laps and drawings are in possession °f superintendent. <br />hoisting is done with bucketrweig}rt of load hoisted 1500 ;s,bucket being <br />attached to sjae steel cable 4 months old,with safety chain and socket <br />fastening, <br />Tranming is done by trammer signals being given to engineer with .° wire <br />bell line attached to ~° gong. ino Colorado code of signals are employed. <br />The skid way consists of triangular savred strips nailed on bed plan};, <br />The method of mining employed is that of overA.and stoping using 2$° Sullivan <br />and Shaw hand air drills and single hand drilling. <br />The atull and drift set systom of timbering is employequaing red spruce <br />and pine. Cornish lip chutes are used. <br />The underground tramming is done by bucket and trolley below the tunnel <br />lovel and one ton steel cars drewn by t~vo burros on the tunnel level. <br />Trackage 12 :t and 20 # steel rails-1S° guage. <br />