Laserfiche WebLink
186 <br />.i0 ft. from main shaft, and is readily aooeasible <br /> <br />to employes. Lighting undar~round by oand es. ~: <br />~' <br />~ <br />~ <br />i., <br />~ <br />S T A T I S T I C S. , <br />.~ <br />r; <br />i ' <br />' I <br /> <br />Could asoertain nothing as to production. r <br />~II,, <br />I <br />l l <br />~', <br />DEVELOPMENT: I l, <br />! <br />I I' <br />, <br />Total rnUnber of feet 250 <br />in shafts , I <br />~i <br />Cost Per foot $30,00 ~ <br />Total number of feet in drifts and levels 150 I'` <br />Coat Per foot $15.00 ~~ <br />'I ~ 4 <br />Total number of foet in oro es cuts 95 ' j <br />~ <br /> • j ±j. <br />Cost Per foot $15,00 ~,` ~' <br />Total number of feet <br />50 <br />in upraises <br />~ I ~i <br />` <br />,~~I <br />Coat per foot $15.00 i f ~ <br />I <br />k <br />i <br />Total mzmbor of foet in development 525. I ,l <br />i~~ ~^IlI <br />1lEN EMPLOYED: I' !i~';' <br />2 miners 8 hours $3.00 '. i,l'~ <br />r, <br />1 er~inees " 4.00 II ~ :'~'; <br />II ,f <br />Total number of men employed 3. !I;~ <br />C09T9: j I~ <br />Cost of ittol ~ 4,00 per oord,avfrrago poet Per month $350. ~ I <br />Coet of timbora, avorage per month $10,00 "I <br />0 ooat Por month $25.00 I Iii <br />Cost of Povrdsr 13-1~2 ote ib, avereg <br />e.5 <br />Average assay valuo of oro, they refused to give ~'; <br />GENERAL REbtAAKS, ~,':I <br />All shafts,Pits and other exoavations on ProPertY I~I !I <br />is saouroly oovared or fonoed. l'I <br />havo boan rePortod to the Dureau of Mirioe. °LI i''~ <br />All aooidenta !iil <br />1[ine oarrios no inauranoe. end is not a rogular ~~''~ <br />Producer nor is it workefl oontinuoualy. '~,!~~i,,~~ <br />Management is familiar with the statuto relating to <br />tho ogerat ion o f motalliforous mines. !LII <br />I~ <br /> <br /> <br />