My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00920
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00920
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2009 1:11:30 PM
Creation date
11/18/2007 12:21:56 PM
Metadata
Fields
Template:
Mine Books
County
Pitkin
Volume
17
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--- <br />Smuggled No. b. <br />~ 1 Ore House, _ <br />i. <br />1 Surf sae Tramway, <br />1 Steam heated Powder House (dug out in dump), <br />1 Mill, <br />,J. <br />1 Sampling"Works, •, ~ ,.,,,.,.... <br />~ 1 City Offioe;" <br />1 Hladksmith•Shop.(poBer,•drill eharpener,~lathe, <br />' ~ air hammer, drill prase and <br />grinding stone) <br />The boiler plant oaneiets of '22 tubular'boilere <br />(size 54" x,16"), one and sometimes two, of whiah are fired <br />~ and kept in readiness, 90~ preseura'oarried. All hoists " <br />can be changed to steam within a short time should the <br />electrical pacer fail. <br />i <br />MILL. <br />~ Ors is crushod, passed thraugp Dozin sampler, rabled <br />' I and put over a aeries of trammels (16 m.m.,l2m.m., 8 m.m.; <br />• 4 1~2 m.m., and l 3~4 m.m.) <br />The aver eAze of each trommel gape to a ~iq of the German <br />Hammer A~•{notype. The under size fram last trammel passes to a <br />' callow screen, aver size fram whioh goes to Harz sand figs and <br />the under sized after olaseif ication, to Wilfley type tainles, <br />tailings fram whiah paea to callow acne, overflow slimos go to <br />Fru Vannere. The tailings fram all fibs are ragraund in six . <br />~ Huntington Mills; fittee with 30 mesh Ton. Cap: screens, are then <br />alaesif ied and paea to another set of 1411f1ey typo tables and <br />Fru Vanners. <br />The mill ie driven entlrely by sleotricity, treats about <br />260 tans per day, saving ahaut 96^~ of the lead; 84°~O of the silver <br />~ and praduoing a oanoontrato running 4 ounoee silver and 30q~ lead. <br />SAIAPLING WORKS. <br />j The sampling warlce is driven by General [•:lectria 80 H.P. <br />I~~otor (olass 4 - 100 amp., 600 volts, M.P.440698, spood b16) <br />The maohinery ooneiste of crushor, rolls, elevator and <br />autamatia samplers. All oro brought to tho sampler le snmpled <br />and bauEtht outrip~t. <br />All low grade oro is sent to the mill, ell shipping ore is <br />~ takon to a mixing room where mixturoe whiah bring the beet pride <br />at the smeltor oro made. The assay affioe whore tho aeeayimg <br />?I <br />
The URL can be used to link to this page
Your browser does not support the video tag.