Laserfiche WebLink
td I N I 27 G (Continued). <br />;p <br />~J- <br />7 C'~~ <br />;^ <br />?i' ~. <br />.,; ,. <br />~ .; <br />i. ,;, <br />'i <br />~'~ <br />~: <br />~; <br />All level stations are provided with a passage-way around working <br />shaft,the shaft is at all stations provided with guard rails. The <br />shaft is secured by pillar of ground on each side sufficient to <br />ensure safety. All winzee or mill holes are covered or surround- <br />ed with guard rails. The shaft is riot being sunk. <br />The power house is 5Q ft south of shaft, <br />The metho3 og ore extraction ie that of drifting and oust-hand <br />atoping ::pith single-hand drilling, The timbering method is that of <br />drift sets and posts and headboards,sufficisnt, <br />The timbers used are white sprats prepared at mill and are good. <br />The loading chutes are of 2-in, plank with wooden slide gates, <br />Underground tra•~ming is done by manual labor with steel mine cars. <br />TracY.age 18 in, guage 9 lb rails. Ventillation is natural and <br />sufficient, t7oxious gases are not met with. Sanitary conditions <br />are good. <br />The shaft ie divided into two compartments,bucket way and man way. <br />The man way ie provided with ladders,the ladders arw safe,secure <br />and accessible. Ladder-isay contains no pipes or bores. Landings <br />are provided in ladder-way not to exceed 20 ft apart. There are <br />no winzee or man ways connecting levels, .dine has two exits for <br />employees,main opening and is oonnected •+~ith Climax mine. Exits <br />are readily accessible to employees, Lighting underground by can- <br />dles. <br />S T A T I S T I C S, <br />Production, <br />AveraEe tonnage per month <br />Development <br />Total number ft in shaft <br />Total number ft in drifts or levels <br />Total number ft in drifts or cross-cute <br />Total number ft in winzee and raises <br />Total number ft in development work <br />400 tons <br />250 ft <br />700 ft <br />200 ft <br />I00 ft <br />1,250 ft <br />