Laserfiche WebLink
S~T A T I S T I C S (Continued). <br />Development <br />Total number ft in drifts or levels 1,000 ft <br />Total-number ft in drifts and cross-cuts 250 ft <br />Total number ft in development work 1,510 ft <br />iden employed <br />8 ?diners at $3,00 for 8 hour shifts <br />1 Timherman ° $3.00 ° , <br />2 Trammers " ::3,00 " <br />1 Engineer " $4.00 <br />Cost" <br />Coat of fuel per ton $5.00 <br />Average coat fuel por month $20.00 <br />Average cost timber per month $300.00 <br />Average cost steal por month $5.00 <br />Average cost oil per month $1.50 <br />Average cost ponder par month $32.00 <br />Average assay value ore par ton $10.00 X <br />Cost pe r ton mining of ore $1.00 <br />There are no transportation or troat~aent charges on the ore. <br />GENERAL REi.fAfi K.S . <br />j No person under the ago of 12 years is employed upon the mine. <br />~; All shafta~pits and other excavations upon tho property are se- <br />~ curely covered or foncod. Strangers or vieitora are not allowed <br />underground unaccompanied by owner or employes deputised to ae- <br />i <br />company them. <br />There has been no accidents to report. The management is sup- <br />plied with blank Accident reports. The mine does not carry indem- <br />Inity insurance against accidents nor acciderd insurance for the <br />iemployees. The mine is a regular producer and the property is <br />(worked continuously. The management id familiar with statutes <br />(relating to the operation of metalliferous mines. <br /> <br /> <br /> <br />