Laserfiche WebLink
i; MINING (Continued). <br />il' _ ~ _ .. <br />~~ <br />li~ <br />}Fork is carried on at the present time on 3rd and 4th levels <br />I. _.. , <br />~i <br />Maps and drawings at office, <br />Hoisting method employed bucket, idea are raised and lowered <br />~~ with hoisting machinery weight of load hoisted 1000 lba; dis- <br />tance hoisted 510 ft, <br />-:n'. ..-z:' <br />~.I _ ^: <br />~1 lrne cable is steel wire 7~Bths and in good condition and has been <br />~ in use three months. Chain hook used on end of cable the same <br /> <br />i <br />I' <br />) being in use two weeks. <br />, . <br />u <br />j'~j <br />There are no safety devices in use to prevent overrwinding. <br />'!~I The material ie hoisted from two levels. <br /> <br />';h <br />',] <br />The bell line is 1~2 in. hemp rope and new. <br /> The state code of signals is posted in the engine room~at collar <br />r <br />,~ of shaft and at each level station. <br />~~ <br />~:. All persons are prohibited from riding on loaded bucket this or- <br />~j der is posted near collar of shaft, <br />'! Notice stating the maximum number of men permitted to ride upon <br /> bucket at one time is posted at collar of shaft and at each lev- <br />j: el station. <br />r,' All level stations are provided with passageway around working <br />lf,. shaft. The shaft is at all stations provided with guard rails. <br />ii' <br />"' <br />~, ', <br />T2ie shaft is secured with pillar of ground upon each aide auffi- <br /> cient to inaure.aafety, „ ,,,, _ ~ <br />~~ , <br />All winzee or mill holes are securely covered or aurrounded..wiLh. <br />i,, <br />' ij <br />I <br />guard rails. <br />. <br />Ilj <br />~ Tho shaft is not being sunk. . <br />~ <br />1 <br />i <br />The power house frame 40 ft west of shaft. 8mithahop frame 10 X <br />' 'li' <br />~' i(; 12 10 ft south of abaft. <br /> <br />~' ;IQ's <br />' The method of ore extraction is that of drifting and upraising at <br />. <br />j 'i~'„i <br />I '~ <br />present~eith single-hand dri118. <br />~ <br />~ <br />~'I w <br />The timbering method is that of combination seta atolls and , <br />j '~;'~~~ <br />~l cribs. The timbering ie sufficient, <br />,Ile The timbers used are white spruce prepared at mill and in good <br />j ;j~ condition. <br /> <br />The loading chutes employed are of 2-in, plank eidee~and 6-in. <br />bottom with wooden slido gates, <br />