Laserfiche WebLink
1d I N I N G (Continued), <br />The marnvay is provided with laddera,the ladder.^, are safe secure <br />and accessible. The ladderway contains steam water and air pipes. <br />Landings are provided in laddenaay not to exceed 20 ft apart. <br />There are winzes and mamaays connecting levels,at least one is <br />kept in repair and equipped with ladders. <br />The property is connected with Penn No. 2 and No. 3 shafts. Exits <br />are readily accessible to employees. <br />LiE2lting underground by candles. <br />S T A T I S T I C S. <br />production, <br />~• <br />Average tonnage por month <br />1,200 tons <br />Development, <br />Total number of ft in shaft 700 ft <br />Total number of ft in drifts or levels 5,000 ft <br />Total rnimber of ft in cross-cuts 2,000 ft <br />Total number of ft in winzes and raises 800 ft <br />Total numbsr of ft in development work 8,500 ft. <br />hten employed, <br />1 `yachine drill man at $4.00 for 8 hour shi.fta <br /> a $3'~ „ <br />7.5 Tdiners <br /> n $3.00 <br />5 Trannsers <br /> <br />' ~ $3.00 e <br />2 Topmen <br /> o $4.00 <br />2 Engineers <br /> n $4.00 <br />1 Pumpman <br /> <br />1 Blacksmith n $4.00 <br /> „ $4.00 ~ <br />2 Foremen <br />Cost+ <br />r ton or month <br />Cost of fuel $5.00 FK +p $150.00 <br />Average cost of timb er por month <br />$450.00 <br />pverago cost of stee <br />er month <br />l p <br />$ 10.00 <br />pverago coat of oil <br />or month <br />p <br />$ 10.00 <br /> month $100.00 <br />Averngo cost povrder <br />or <br />p <br /> $ 10.00 <br />Average assay value ore por ton <br /> <br />