Laserfiche WebLink
• 1d I N I N G (Continuedl. <br />The agaft is divided into two compartmenta~cageway and toanway. <br />The taamvay is provided with ladders,the ladders are safe~nocure <br />and accessible. Ladderway contains steam and water pipes. <br />Landings are provided in ladderwny not to exceed 20 ft apart. <br />There are winzes and manways connecting levels~at least one is <br />kept in iepair and equipped with ladders. <br />The mine is connected'witli Penn No. 1 and Penn No. 2 shafts. <br />Exits are raedily accessible to employees. Underground lighting <br />by candles. <br />S T A T I S T I C S. <br />Production, <br />Average tonnage per month 1,000 tons <br />Developmont~ <br />Total number of ft itt shaft 500 ft <br />Total Number of ft in drifts or lovols 14,000 ft <br />Total number of ft in cross-cuts 800 ft <br />Total number of ft in winzes and raised 15,000 ft <br />Total number of ft in development vrork 50300 ft <br />.den omployed, <br />12 ;diners at $3.00 por day for 8 hour shifts <br /> <br />2 Trammera n <br />" $5•~ <br />1 Topman " $3.00 " <br />1 Engineer <br />" $4.00 ° <br />1 Foreman ' $4.00 " • <br />Coat <br />Cost of fuel $5.00 per tonrcost por month $50.00 <br />Average coat of timber per month <br />650.00 <br />Average coat of steel per month $ 5•~ <br />Average cost of oil par month $ 5•~ <br /> <br />e coat <br />Averag <br />of powder per month <br />$30.00 <br />Average valu e ore per ton <br />$ 8.00 <br />Coat per ton <br />of ore <br />mining <br />$ 1.35 <br /> • $ ,45 <br />Coat per ton transporting ore <br />Coat per ton treatment of ore <br />$ 5.00 <br /> <br />