My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00914
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00914
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2009 10:25:53 AM
Creation date
11/18/2007 12:21:42 PM
Metadata
Fields
Template:
Mine Books
County
Lake
Volume
10
Document
Inspectr
Suffix
B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 1d I N I N G (Continuedl. <br />The agaft is divided into two compartmenta~cageway and toanway. <br />The taamvay is provided with ladders,the ladders are safe~nocure <br />and accessible. Ladderway contains steam and water pipes. <br />Landings are provided in ladderwny not to exceed 20 ft apart. <br />There are winzes and manways connecting levels~at least one is <br />kept in iepair and equipped with ladders. <br />The mine is connected'witli Penn No. 1 and Penn No. 2 shafts. <br />Exits are raedily accessible to employees. Underground lighting <br />by candles. <br />S T A T I S T I C S. <br />Production, <br />Average tonnage per month 1,000 tons <br />Developmont~ <br />Total number of ft itt shaft 500 ft <br />Total Number of ft in drifts or lovols 14,000 ft <br />Total number of ft in cross-cuts 800 ft <br />Total number of ft in winzes and raised 15,000 ft <br />Total number of ft in development vrork 50300 ft <br />.den omployed, <br />12 ;diners at $3.00 por day for 8 hour shifts <br /> <br />2 Trammera n <br />" $5•~ <br />1 Topman " $3.00 " <br />1 Engineer <br />" $4.00 ° <br />1 Foreman ' $4.00 " • <br />Coat <br />Cost of fuel $5.00 per tonrcost por month $50.00 <br />Average coat of timber per month <br />650.00 <br />Average coat of steel per month $ 5•~ <br />Average cost of oil par month $ 5•~ <br /> <br />e coat <br />Averag <br />of powder per month <br />$30.00 <br />Average valu e ore per ton <br />$ 8.00 <br />Coat per ton <br />of ore <br />mining <br />$ 1.35 <br /> • $ ,45 <br />Coat per ton transporting ore <br />Coat per ton treatment of ore <br />$ 5.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.