Laserfiche WebLink
:, <br />S U R F A C E P L A N T (Continued). <br />The headframe.consiats of six posts. l0 X 12 20 ft high. Tho sheave <br />wheel is 4-12 ft in diameter of cast steel. <br />The blacksmithshop is in engineroom. <br />The engineroom~working shaft and blacksmithshop ara not under one r; <br />• ; <br />roof. There is suitable protection against firs provided.. ~'; <br />Stable frams 12 X 15. Timberyard on dump. <br />The ore is dumped on cars. The water supply is from the wino. <br />The surface transportation is by railroad and wagonroad. <br />The ore treatment employed is smelting. )Hine has mill~but it is <br />not. in use., <br />E X P L O S I V F. S. <br />The explosives used are of the 40R 7~8ths Dupont prn~der~capa XXXXX~ <br />Lear brand fuse. <br />Iron or metal tamping bars are not employed; wooden tamping bars <br />are provided for employees. Powder monkey not employed, , <br />Explosives in excess of one days supply are not atoned underground <br />The explosives are stored in A magaZiIIO provided for that purpose 5,~~•• <br />alone. The magazine is 50 ft from working shaft or other build- <br />inga. Amount of explosives kept in storage 100 lbs. <br />The magazine is a frame box 2 X 4 buried in dump. ~ <br />The device for thawing powder is of galvanized iron water jack- <br />~' <br />oted. Oils~ca:cdles or other cambustiblea are not stored with prnv- <br />der. , <br />1dIN IN6. <br />The property is devolaped by a vertical ahaPt 4-1~2 X g~two com- <br />partmonts~rribbod with 6 X R cribbi:cg end is 500 ft deep. I <br />ii <br />The work is carried on at the present time on first level 150 ft <br />frac surface.. }3aps and drawings at office. <br />The hoisting method employed cage. <br />t3en are raised and lowered vrith tioiating mnchinery~weight of <br />load hoisted 1500 lba~distanca hoisted 150 ft. <br />The cable is at6e1 wino rope 7~gtha inch and im good condition. <br />