Laserfiche WebLink
;, <br />'~,; <br />!'~~. <br />~~ <br />l <br />?.i I N I N G (Contirnied,l <br /> <br />` .. <br />'' <br />ilndcr ground tramrain is done by manual labor with steel nine cars. <br />;~ TracY.age 16 in gunge and R lb rails. <br />S <br />i, <br /> <br />' <br /> <br />Amount of xater dealt with in gals per minute - average - 20 gals, <br />~ <br />" <br />~ <br />• e ditc'~ on right side of tunnel entrance. <br />Dra_r.^.~ <br />, , <br />~ The ventillation is suction air pipe,f, in pipa,is run by jet of com- <br />'~li pr<_saed air. Ventillation is sufficient, <br />~'( Noxious gases are not m=t..vci th. ' <br />• <br />f~'~: Sanitary conditions are good <br /> , <br />. <br />'' <br />( <br />I <br />:'i; <br />All old timbers have been removed from under ground worY.ings wher- <br />I <br />~ ever necessary. <br />` " <br />~ ~ <br />I1 ~ji Tile shaft is divided two compartment,ladder-way and bucY,et-way, <br />.+,. <br />;;i~ <br />r,P <br />The ladders are safe,secure and accessible. <br /> <br />f ~. <br />~~ Tne ladder-way does not contain stenm;uater,air pipes or boxes. <br />~' ~ <br />' ~':~~ <br />3 I The shaft has but one exit for omployes. <br />. <br /> <br />>ji';' <br />i <br /> <br />Under ground lighting by candles, <br />,t <br />i ~ ;, <br /> .^> T A T I S T I C, <br />Developments <br />' ?otal fio ft in shaft 100 ft <br />Total No ft in tunnel 600 ft <br />Total Iio ft in drift 100 ft <br />Total ;io ft .in development vrorY. R50 fi <br />' ?don employed, <br />~! <br />~J' 2 ldachine drill men 54,00 for R hr shift <br />' 2 3lachine helpers $3,50 " <br />~,.' <br />~~.~' <br />~~. 2 Trammers 53,00. " <br />',~' 1 Laborer ~ 53,00 " <br />~;~ 1 Suprrintendent $b.00 " . <br />Cost <br />Cost off' fuel per tan ~~~ <br />