My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00905
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00905
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 11:08:59 AM
Creation date
11/18/2007 12:21:26 PM
Metadata
Fields
Template:
Mine Books
County
Saguache
Volume
14
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
51k~ <br />Spruce and Pine, prepared by hand. underground tramming <br />is done by trolly. One Oaq, 2,000 gallon water pump is <br />used for draining. The system of ventilation,ia natural. <br />The shaft is divided into two compartments. One is bucket <br />and the other is for employes. The shaft is provided with <br />ladder~+way. The ladders are safe, secure and accessible <br />at all times for employes. Landings are provided at each <br />20 feet. Ladders are connected with winzes. At least <br />one of the man-ways is kept in reach, equipped with good <br />ladders at all times. The mine has but two Baits for <br />employes. Candles are used for lighting underground. <br />S T A T I S T I C S <br />The gross tonnage is 30 tons per day. Total number of <br />feet in shafts, 400. Cost per foot, $3b.00. Total number <br />of feet in tunnel, 7,000. Cost per foot, $16.00. Cost of <br />fuel, $11.00 per dap. Cost of powder, 16¢ per pound. <br />Average assay value ore per ton, $15.00. Cost per ton milling <br />of ore, $2.00. Cost per ton transporting ore, 60¢. Cost <br />per ton treatment of ore, $2.50. <br />M E N E M P L O Y E D <br />3 machine drillers at $4.00 for 8 hour shift. <br />2 machine helpers at $2.00 for 8 hour shift. <br />1 timberman at $4.00 for 8 hour shift. <br />3 trammers at $3.00 for 8 hour shift. <br />~l ore assortera at $3.00 for 8 hour shift. <br />1 laborer at $5.00 for 8 hour shift. <br />1 engineer at $4.00 for 8 hour shift. <br />1 Yireman at $3.00 for 8 hour shift. <br />1 blacksmlth at $4.00 for 8 hour shift. <br />1 superintendent at $b.00 for 8 hour shift. <br />(}ENERAL AEMARRB <br />Ho person under the age oP 12 years ie employed in the <br />mine. All shafts, pits or other excavations on the property <br />are securely covered and fenced. No strangers or visitors <br />are allowed naderaronnd unless accompanied'~r owner or era- <br />ploys deputised to accompa~I them. <br />reported to the Bureau of d(inea. <br />All accidents have been <br />uanagement is supplied with <br />-: 3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.