Laserfiche WebLink
<br /> <br /> STATISTICS. <br />~" and 2 1~4" <br />. <br /> , <br />hand drill- <br /> Orq~~s;r toixnAr;e, 1,000. <br /> 'AKOrage;aorinage .per.month, 300. <br />" <br />and Totsl <br />NQ. , of feat. in; ghnfta,- 350.-Cost per foot <br />y20 <br />00 <br />i <br /> <br />stulle , <br />. <br />. <br />To,tal <br />~14 o~,,feet in drift s,o,r levels; 350v Cost ..per foot., 5>r10.00. <br />mo.tal'.No <br />of,.~fe <br />et;an-vrin <br />as <br />d <br /> <br />a a.re dry, , <br />. <br />F <br />an <br />raises, 30 ft; Cost per foot, 10.00, <br />Total X70 .of,feet in development, 630. <br />iition, hrenemployed,.. ' <br /> 8 macfiinp drillmen, 5p4.00 for P hour shift <br /> , <br />1 machine kelper, <br />3. b0 " e " " <br /> , <br />3 timbermen; 3.50 " 8 " n <br />rucks, and 4 tram~se rs, 3.00 n g n " <br />' 4 ore sorters, 3.50 „ 8 „ ,~ <br />off buclcete, 2 top men, 3.00 " 8 " ~~ <br /> 2 engineers, 4.00 " D '~ n <br /> 2 blaxksmithe, 4.00 " 8 " " <br /> 1 carpenter, 4.00 " 8 " " <br />In mrike 2 foremen, s";4.00 and X5.00 i'or" ~ '~ <br />line, It Average number oi' men .employed for the <br />year <br />30. <br /> , <br />, <br />10 on surfacr, and 20 underground. <br /> Cost of i'uel, v?5.?5 per ton, average cost per month, 250.00. <br />Cost of ti <br />b <br />~ <br />~mxd rvorkings, m <br />er N22,b0 per i!, P.verage coot pex• mwxth <br />~ <br />'200.00 <br /> , <br />. <br />Cost of stsel 10~ per lb, Average cost par month, ;15.00. <br />~rovlded Cost of oil 50;~ per gal; Average cost per moixth, :325.00. <br /> Cost of powder 14S! per lb, Average cost per moot}}, 5x250.00. <br />larlr'ers aCa <br /> Average array value are pex• ton, ~y70.00. <br />air pipes, Cost per ton mininl; of ore, ;jf3.00.. <br /> Cost per ton transporting ore, 50j! by wagon to R.R., and 5p2.00 on <br />The mine R.R. <br /> Cost per ton treatment of ore X9.00. <br />This is <br />