<br />
<br /> STATISTICS.
<br />~" and 2 1~4"
<br />.
<br /> ,
<br />hand drill-
<br /> Orq~~s;r toixnAr;e, 1,000.
<br /> 'AKOrage;aorinage .per.month, 300.
<br />"
<br />and Totsl
<br />NQ. , of feat. in; ghnfta,- 350.-Cost per foot
<br />y20
<br />00
<br />i
<br />
<br />stulle ,
<br />.
<br />.
<br />To,tal
<br />~14 o~,,feet in drift s,o,r levels; 350v Cost ..per foot., 5>r10.00.
<br />mo.tal'.No
<br />of,.~fe
<br />et;an-vrin
<br />as
<br />d
<br />
<br />a a.re dry, ,
<br />.
<br />F
<br />an
<br />raises, 30 ft; Cost per foot, 10.00,
<br />Total X70 .of,feet in development, 630.
<br />iition, hrenemployed,.. '
<br /> 8 macfiinp drillmen, 5p4.00 for P hour shift
<br /> ,
<br />1 machine kelper,
<br />3. b0 " e " "
<br /> ,
<br />3 timbermen; 3.50 " 8 " n
<br />rucks, and 4 tram~se rs, 3.00 n g n "
<br />' 4 ore sorters, 3.50 „ 8 „ ,~
<br />off buclcete, 2 top men, 3.00 " 8 " ~~
<br /> 2 engineers, 4.00 " D '~ n
<br /> 2 blaxksmithe, 4.00 " 8 " "
<br /> 1 carpenter, 4.00 " 8 " "
<br />In mrike 2 foremen, s";4.00 and X5.00 i'or" ~ '~
<br />line, It Average number oi' men .employed for the
<br />year
<br />30.
<br /> ,
<br />,
<br />10 on surfacr, and 20 underground.
<br /> Cost of i'uel, v?5.?5 per ton, average cost per month, 250.00.
<br />Cost of ti
<br />b
<br />~
<br />~mxd rvorkings, m
<br />er N22,b0 per i!, P.verage coot pex• mwxth
<br />~
<br />'200.00
<br /> ,
<br />.
<br />Cost of stsel 10~ per lb, Average cost par month, ;15.00.
<br />~rovlded Cost of oil 50;~ per gal; Average cost per moixth, :325.00.
<br /> Cost of powder 14S! per lb, Average cost per moot}}, 5x250.00.
<br />larlr'ers aCa
<br /> Average array value are pex• ton, ~y70.00.
<br />air pipes, Cost per ton mininl; of ore, ;jf3.00..
<br /> Cost per ton transporting ore, 50j! by wagon to R.R., and 5p2.00 on
<br />The mine R.R.
<br /> Cost per ton treatment of ore X9.00.
<br />This is
<br />
|