My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00890
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00890
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2009 11:26:21 AM
Creation date
11/18/2007 12:21:02 PM
Metadata
Fields
Template:
Mine Books
County
Clear Creek
Volume
6
Document
Inspectr
Suffix
F
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ <br />ho springs, <br />METALLURGICAL PL4NT. <br />JOE REYNO>JD'S 1~4III, <br />oee of <br />'s Mine, <br />position on <br />. and on the <br />l connecting <br />This Mill consists of a frame structure, 50 x 90 ft, <br />with addition 16 x 'u6 ft. in rear, all covered with <br />elaterite. The above contains 9 x 15 Blake Crusher; <br />trommels or screens, rolls, three, three compartment <br />Hartz jigs, ono battery of 5 stamps, 3,V shaped sizers, <br />2 Cammet and one spiral plane concentrating tables. <br />One 3 ft. Sampson turbine water wheel, which furnishes <br />power to the above. <br />The process may be briefly described as follows:- <br />The ore is hauled from the Joe Reynold's dump by wagon, <br />dumped over grizzlies, the coarse material doing through <br />a 9 x 15 Blake crusher, which adjoins the fines, doing <br />to the rough rolls, thence to trorcwels, the material <br />goind through the rough trommel, goind back throudh a <br />finishing roller. The material after paw ing through <br />trommels, going to Z, three campartinent Hartz jigs. <br />The waste from the jids, is conveyed to the stamp battery, <br />where it is re-crushed, and elevated to 3, V, shaped sizers, <br />the overflow going to waste, and the head3going to two <br />Cammet and one spiral plane concentrating tables. <br />The ore treated is the silver lead ore, with ~, <br />very little zinc. <br />Concentrates average shoat 70 oz. silver, and 30% <br />lead, Capacity u0 tons, per 24 hours. <br />STATISTICS. <br />Two teamsters, <br />3' millmen, <br />1 foreman <br />~~3.00 per day of 9 hours. <br />3.00 „ „ „12 „ <br />4.00 „ „ <br />
The URL can be used to link to this page
Your browser does not support the video tag.