Laserfiche WebLink
MINING qND MINE METHODS. <br />The main opening is an adit or tunnel, 3-1~2 x 7 ft. <br />extending in a S, 17, direction, about 900 ft, to breast, vrhere <br />Titley 8~'Swanson, operating under a contract, are at work. <br />At a point about 250 ft. from the mouth of the tunnel,. <br />a drift runs 5, D5 Pt, to breast. At a point about 750 ft. <br />fmom the mouth of the tunnel, across gut runs f15 ft, vrest, to <br />breast. A winze GO ft, deep is sunk from tunnel level, <br />at a point about 700 Pt, from the mouth. Some stoping ( 75 ft, <br />high, and 25 ft, long,) has been done ,just over said winze. <br />The tunnel is driven on vein, the name of which, I <br />could not learn, the ultimate purpose being, to cut the Ohio <br />vein. <br />P.tethod of ore extraction a;mplayed, is overhand stoping, <br />employing hand drilling, bath single and double. <br />1Sethod of timbering employed, drift sets, of pine, in <br />fair condition. <br />Underground tramming is done by a man, with one ton steel, <br />end dump car, Trackage, 8 lb, rail, in poor condition on <br />account of grades. <br />California <br />Drainage, natural. <br />eing Ventilation, natural- :fair. <br />Sanitary conditions, fair, <br />ed vrater <br />The undergrannd lighting is done by candles. <br />laved, Tunnel is in bad shape, as roof' is very low in places, and <br />ut being <br />grades excessive, the reenlt of which, an accident might occur <br />by aar getting away from tralmner. <br />