Laserfiche WebLink
S T A T I S T I C S. <br />Cost of fuel per month $2300.00 <br />Coat of timbers about #700.00 <br />Cost of steel per month for mine and mill $222.39 <br />Cost of oil per moth $157.38 <br />Cost oP powder per month $3000.00 <br />Coat of transporting supl?liea to mine $1300.00 <br />hauling <br />Coat of M~IdLIZntg concentrates per month to R. R. $2750'00 <br />Average assay value per ton $6.72 <br />Total expense per ton $4.38 <br />Total number of feet uri ehgfts 2275 Coat $20. per foot. <br />motel number of fbet in crosscut 2028 Coat $18. per foot <br />Total number of feet in rakes 9427 Cost $10. per foot. <br />Total number oP feet in drifts 61454 Coat per foot $10. <br />1[EN EMPL OYEP. <br />4 Office help $5.50 for 8 hours <br />3 Foreman 8.50 <br />2 assayers 5.00 " <br />3 shift bosses 5.00 " <br />3 machinists 4.75 " <br />32 mach]ne dr111men 4.00 " <br />8 engineers 4.00 " <br />7 blaokaaitha 4.50 " <br />47 mlilmen 4.00 <br />95 laborers 3.25 • <br />GENERAL REMARK S. <br />No person under the age of twelve ~re ars le emplo3re d in <br />the mine. Strangers or visitors are not allowed underground <br />unless accompanied by someone familiar with the mine. <br />All accidents have been reportdd to the Bureau of !~inea. <br />The Tomboy vein is tapped by a crosscut 1650 feet song <br />and drifts running each direction to their end lines and <br />811 vein matter le taken out above said tunnel. 21o work <br />going on in Tomboy ~uat at present. The main tunnel is <br />equipped with a set of doors, and can be opened from <br />without. Hoisting plaTlt has Your electric hoists, one <br />large one used on the main shaft and three for sinking <br />winzes, hoisting timbers from one level to the other. <br />