Laserfiche WebLink
- 5- <br />SURFACE PLANT. <br />9 <br />At the main shaft is located a shaft house, frame, 35x50, k <br />i <br />the containing one Denver Bdiler Works BO H.F. boiler. ` <br />(' <br />1 tdorwalk -Air compressor, 35 H.P. <br />1 Steam hoisting plant, 8 x 10 double geared 35 H.F. } <br />Also blacksmith shop, and office room. <br />The head frame of the shaft 10 x 10, with 4 ft. iron <br />sheave wheels. <br />There is also one 6 room dwelling house upon the property. <br />Ore bins and creme sorting house. <br /> <br />