Laserfiche WebLink
.. _g_ <br />srar~sncs. <br />i <br />DEVELOPMENT. <br />:' Richmond Shaft No. 1, <br />300 ft. deep. <br />;Drift at 60 ft. level, N.225 ft. <br />• " " 110 " " " 110 " 3. 250 ft. <br />" " 1 ~ " " " 160 • <br />" " 346 <br />" k 210 " " " 200 " " 75 ". <br />" " 270 " " " 225 " " $40 a <br />Richmond Shaft No. 2, 450 Ft. Dee <br />P• <br />Drift at 280 ft. Level, N. 70 ft., S. no entry,orosa-ot.30 ft <br />" " 380 " " " 150 "~ " 325 Ft. " " 10 " I <br />" " 440 " " " ~ " 125 ", ' <br />} <br />Total number of feet in shafts, 750, I <br />met, $40,00 per foot. ~ <br />Total number of feet in drifts, 2iB50, <br />Cost, $7. per foot. i <br />Total number oP feet in orosa-outs, 40. <br />met, $10. per foot. 1 <br />j Total No. it. i'n development, 3,840. <br />r <br />Average tonnage, 20 tone peS m,nth. ~ili <br />' ?LEN EMPLOYED. <br />No.employed, <br />• 2 mina8e, $3.00 for 8 hour shift. <br />1 engineer, 3.60 " ^ ". <br />1 superintendent, 4.00 " • <br />Average No. of men employed for the yenr has been Siva. <br />Cost of fuel $4.b0 per,ton. abet of Timber, ;30 ~ to $1.~0 per <br />etiok. Lb et of ponder, $12.70 per hundred, all supplies <br />delivered nt the mine. <br />Average neeay value ore per ton $20. Chat per ton for trane- <br />porting ore, $2.3b; aoet per ton treatment of ore, $8.00 <br />