Laserfiche WebLink
<br />and is <br />d are in <br />There are <br />ed by hand <br />ade by the <br />er is hoisted <br />;ompressed <br />fund workings, <br />equipped •,rith <br />The ladder <br />ladder <br />There is <br />ie nt and <br />employees. <br />STATISTICS. <br />Gross tonnage, 300. Averap;e tom~age per month, 100. <br />Development. <br />Total feet in ailafts, 600. Cost per foot 5815.00. <br />Total feet in drifts or levels, 300. Cost per .foot 587.00. <br />Total feet in development, 900. <br /> Men employed. <br />2 machine drillmen, ~ 5p4.00 and X4.50 for B hour shift <br /> <br />1 <br />machine helper <br />4.00 <br />'~ <br />g '~ . <br />~~ <br />3 mine rs , 3.00 " g ~~ n <br />2 timbermen, 4.00 ~' 8 ~~ " <br />2 t rarrune rs , 3.00 '~ 0 ~' " <br />2 ore sorters, X3.00 a nd X84.00 '~ 8 ~' " <br />1 top man, 3.00 ~~ g n n <br />2 engineers 4.00 " g ~~ u <br />1 blavksmith, 4.00 " g ~~ ~~ <br />1 foreman, ~ 00 <br /> Average numDar of men employed for the year, 17. <br /> 13 underground, and eix on su rface, <br /> Cost. <br />Cost of fuel, I;p6450 per ton. nverag•e cost permont, 5840.00. <br />Cost of timl,er, :p22.50 por TIf. AveraE;e cost per month, .;,8125.00, <br />Cost of steel, 9r! per 1'0, <br />Cost of oil, G0, per gal. <br />Cost of powder, `14.00 per curt. Averap;e cost per mouth, j75.00. <br />Averago assay valus.ore per ton, p40.00. <br />cost per ton, tram;portinp; ore ;81.00 fly ~aa~;on rvrd 583.50 by RR. <br />Coat per toe treatment of ore ,88.00. <br />