Laserfiche WebLink
(2) <br />3r1t3 <br />weight oP load hoisted:-IOOO.1ba.Diatanee hoisted:-lF00 Peet. <br />Cable 3~~ steel rope-new-Buoket fastened to gable by ohain hook <br />and olampa-Mining Hureau signal code uaed,whioh are posted in <br />engine room and collar of shaft. <br />trine methods. <br />!No ore being extracted,ahaft being re-timbered,l7o water baing <br />handled-Ventilation-Natural draft.Lighting underground-Candles. <br />Statiatios. <br />No production of mineral to date. <br />Total No.of feet in shafts:-425.Estimated coat:-E20,per foot. <br />ESen employed. <br />'!F Hinera. $3,00. per day. S hour shift. <br />!I I Engineer. X4.00, " " 8 " " <br />Cost. <br />No fuel used. <br />Coat of timber X22 gar IOOO.Average cost per month:-7~I00. <br />No powder Coat to date. <br />?!o ore Produced by present leasers. <br />veneral remarks. <br />No persons under I2 years employed-All shafts,pita,and exoava- <br />tions covered or Fenced in-NO strangers alloxed underground- <br />All aocidenta reported to !lining Bureau-!dine does not onrry <br />indemnity inaurnnoe against aocident-f.iine osrrya no insuranoe <br />for employees-!dine is not a ragular »rodueer-Hine has not been <br />worked continuously-Property ie not cub-leased. <br /> <br />