Laserfiche WebLink
(31 srt5 •f <br />Timbering:-Method employed:-Square setts-Drift setts-Stuils,$nd i <br />cribs-Sufflolent.Ordinary mine chutes used in mine-Condition of <br />timbers-OOOd.Ordinary mine care in use-Underground tra.*mcing by <br />men-Trackage-I2 lb.to the yard rail. <br />Drainage:-50 gals.per minute-Electric pumPa.Ventilation-Natural <br />draft-Sufficient-No noxious gases met with.All shafts are divi- <br />ded into two compartments with ladder ways which contain rater <br />and air lines-Shafts are all connected giving ready exits to <br />employees-Lighting underground by electricity and candles. <br />Statistics. <br />Average tonnage per month:-600.-Orosa tonnage per year:-I0,000. <br />Developement, i <br />Dotal No.of Peet in ahaP*.s:-3000.-Cost per foct:-$25.OC, <br />" " " " " levels drifts and upraises over 35,OOO.feet <br />average cost about:-$7.OO.per foot. <br />Men employed. <br />7 Machine drillmen. $3.50. Per day. 6 hour shift. <br />60 Miners. $3.00. " " Y " " <br />2 Timbermen. $3.50. " " F " " <br />2 Topmen. X3.00. " " 6 " " <br />2 Engineers. $4.00. " " 6 " " <br />I Blacksmith. $4.00. " " F, " " <br />2 Foremen. 54.00. " K <br />I Superintendent. 57.00. " 6 " " I~ <br />Total No.of :pen employed for the year:-I00. ~ <br />Oost. <br />t <br />No fuel uaed,power electricity. <br />Coat of timber:-$25.OO.per IOOO.Average coat Per month:-$160. Ilf <br />" " powder:-15 eta,per lb. ' " " " " :-$500. ~i <br />Average assay value of oro por ton:-$20.OU. <br />Coat per ton mining ore:-$6.OO.000t par ton transporting ore <br />81.0O.OOHt per ton treatment of ore:-$5.00. ~' <br />i <br />General remarks. <br />2Jo persona under I2 years employed-All pits and exoavationa j <br />covered-All accidents reported-Mine carrys indemnity insurance lI <br />II <br />against accident-London Guarantee Co.E!ina oarrys no insurance ,I~ <br />for employeesTkine is regular produear,and worked continuously ,j <br />Property is not leased or sub-leased. <br />