Laserfiche WebLink
sransncs. <br />'Production;- 'j <br />i <br />Grose tonna;;~e, for three ,years, 30,000. Averap;e tonnage per <br />month, 800. <br />,Development:- <br />Total number oi' feet in shafts, 2000. Cost per foot, ~j29.00 ;, <br />Total number of feet in tunnels or ad Its, 1 mile. <br />Total number of foot in drifts or levels, 9 miles, cost per <br />foot X7.00. <br />Total number of feet in minxes and rriisos, 1600. <br />Total mzmber of feet in development, 1 mile. ~. <br />?,abar;- Ilo.amployed <br />75 miners, ~~t ;p3.00 for 8 hour shift. <br />1 traruner " 3.00 " S " " <br />5 ore sorters 3.00 " B " " <br />1 bl;aclcs :ith 4.00 " S " " <br />1 Supt. 4.25. "~ <br />Average nurtioer of men employed for the year, about 50. <br />Cost:- <br />Cost of fuel, x}5.50 per Lon. A•/orage coot per month, 5p400.00, <br />Cost of timber N22.00 per I'L. ;vera~;e cost per month 4x200.00. <br />Supplies delivered to mine. <br />Cost per ton treatme:xt of ore, 4¢7.00 to ;}10.00. <br />