Laserfiche WebLink
I MINING AND MINE METHODS. <br />The IIurns shaft located 11.35°4!.400 ft.from tP,e riouth of the Oreat <br />I <br />4le.stern tunnel.Altitude of collar 8945 ft. <br />Vertical.3~';{7' for the first 400 ft.thence 3~~"!.8' to bottom.Depth 512 ft. <br />Two compartment bucket and ladder way,laddors being vortical. <br />Shaft has levels at - <br />I <br />' I 100 ft.cut station. <br />300 ft.crosscut south west 2r5 ft.throubh porphyry to fault. <br />500 ft.crosncut 75 ft.ta the sour}, vrest through porphyry. <br />Are driving the 500 ft.crosscut to the. south west to fault and to :~~ <br />I I` <br />connect with the 17thrlevel of the. Durant workingn for ventilation <br />drainage and exit. <br />The 1'ionecr tururel-elevation 8fi78 ft. b;outt. of.rrhirh in 330 ft.S.l7.of <br />the a.L•'.L'or.I'ioneer claiim. Course parallel to Yionner 850 ft.to fault <br />~ stri}a ng same at distaru6 of 660 ft.from mouth, Plot in use. <br />Hointit4, done by bucket attached to ~" ores! cable in une three months, <br />safety chain and clip fastening. 4leight of load hoisted 1500:q Distance <br />hoisted 500 ft. <br />Sii;nals givetr with ~" hemp rope attached to 1G" Yong. L'oloradn code <br />Jae <br />~ employed. <br />tdining at present consists of crosscutting and drifting. 3'/s ~ /T'w...oC <br />Cs.-r ~ o o ~'~,...,..,,...,i <br />Timbering consists of cribbing in shaft and sets at stations. Savred pine <br />is employed. <br />Underground trar.,s,itrs -bucket and trolley. <br />Traeknge 18" guase-lit rails. <br />Drainage effected by f1o 5 Cameron pump located at bottom of nhaft,rais- <br />ing to Florthington station pump located on 300 ft.level,;vhich in turn <br />raises to surface. <br />Ventilation-r4stural. <br />Seuritary conditions-good. <br />There is no exit other than shaft which is provided with vertica] ladder <br />road. <br />Connection is being wade wit}t 17th,level Durant. <br />