Laserfiche WebLink
STATISTICS . <br />Production, <br />. Average tonnage per month 300 tons <br />Development, <br />Total Plo ft in shaft 600 ft <br />Total Ido ft in drifts or levels 3,000 ft <br />Total Pio ft in ex•oss-curs 700 ft <br />Total Tlo ft in raises 135 ft <br />Total Pio ft in development vrork 4,435 ft <br />?den employed, <br />1 'dachino drill man at 3.50 for 8 hr shift <br />n s 9.00 <br />15 :diners ~• <br />3 Trammora " ° ~~ <br />° 4.00 <br />1 Enginaor ~' <br /> <br />u <br />1 G'oroman <br />u <br />Cost, <br />Coot fu01 pnr ton ,4,0(1 <br />Avnrngs cost fuel pnr month ,~j100,00 <br />AvuY•ago cost umbers pnr montlY ~150,i)0 <br />Avsrags cost atenl pnr mor:tlY ~7,(r0 <br /> <br />,or month <br />Avorapo cost oll } <br />;)5.00 <br />Avsrngn cost r,mvdor pnr worth y;7G,U0 <br />AVnragO a8`IYY~/ Vriluo 01 ~+ pe l' 6011 <br />4.(xl <br />' .~n¢ <br />n <br />COftt psr tOn Itll Yll Ylp Of OY <br />Cost pnr tun trrtrlnportlnd; oro <br />.4I• , <br />~ <br />Thsro aro no trnr,tment r,}u,r/;as on oro. <br />1 <br /> <br />